Date (week
starts) |
Weekly Summary |
E-beam Status |
CO2 Status |
2013/05/06 |
|
Exp: Beam
Studies
Uptime (days): 5
Downtime (days): 0
Beam Parameters:
Energy: 64 MeV
Charge: 500 pC |
Exp: Ion
generation
Uptime (days): 4
Downtime (days): 1
|
2013/04/29 |
|
Exp: Beam
Studies
Uptime (days): 3
Downtime (days): 2
Beam Parameters:
Energy: 57.9 MeV
Charge: 500 pC |
Exp: Ion
generation
Uptime (days): 2
Downtime (days): 3
|
2013/04/22 |
Summary of
ATF operations for the week of April 22-26 |
Exp: Single
Electron (AE55)
Uptime (days): 5
Downtime (days): 0
Beam Parameters:
Energy: 57.9 MeV |
Exp: Ion
generation
Uptime (days): 4
Downtime (days): 1
|
2013/04/15 |
Summary of
ATF operations for the week of April 15-19 |
Exp: PWFA
Holography (AE43)
Uptime (days): 3
Downtime (days): 2
Beam Parameters:
Energy: 57.9 MeV
Charge: 500 pC |
Exp: Ion
generation
Uptime (days): 5
Downtime (days): 0
|
2013/04/07 |
Summary of
ATF operations for the week of April 08-12 |
Exp: PWFA
Holography (AE43) -
installation
Uptime (days): 0
Downtime (days): 5 |
Exp: Ion
generation
Uptime (days): 5
Downtime (days): 0
|
2013/04/01 |
Summary of
ATF operations for the week of April
01-05 |
Exp: PWFA in
QNR (AE50)
Uptime (days): 3
Downtime (days): 2
Beam Parameters:
Energy: 57.9 MeV
Charge: 500 pC |
Exp: ATF Operations / Ion
generation
Uptime (days): 4
Downtime (days): 1
|
2013/03/25 |
Summary
of ATF operations for the week of March
25-29 |
Exp: PWFA in
QNR inst. and beam studies
Uptime (days): 2
Downtime (days): 3
Beam Parameters:
Energy: 57.9 MeV
Charge: 500 pC |
Exp: ATF Operations / Exp. Prep.
Uptime (days): 5
Downtime (days): 0
|
2013/03/18 |
Summary
of ATF operations for the week of March
18-22 |
Exp: Beam
Study & PWFA in QNR installation
Uptime (days): 2
Downtime (days): 3
Beam Parameters:
Energy: 57.9 MeV
Charge: 500 pC
|
Exp: ATF Operations / Exp. Prep.
Uptime (days): 5
Downtime (days): 0
|
2013/03/11 |
Summary
of ATF operations for the week of March
11-15 |
Exp: Beam Study & Single Electron
Uptime (days): 4
Downtime (days): 1
Beam Parameters:
Energy: 57.9 MeV
Charge: 500 pC
|
Exp: ATF
Operations / Exp. Prep.
Uptime (days): 5
Downtime (days): 0
|
| |
|
|
|