‚:: BB 0.3945 Full G&A 0.273 LW NIH G&A
0.312 LW Serv G&A 0.355 Full NIH G&A
0.030 FCR
0.030 Safeg&Sec
this line and data above not included in print out
BROOKHAVEN NATIONAL LABORATORY
FY 2006 STANDARD RATES
Effective October 1, 2005
Note 1: Rate is not yet developed.          
Note 2: Intrim Rate           
FY 06 Approved Rates 
FY 05 Rate BNL Users Only DOE Program Non DOE Program & NIH(New Proposal)  NIH Program(Existing grants only)
  Direct Machine Direct Machine                 Total   3% Full Cost                
  Portion Power  Portion Power  Total Laboratory Total Safeguard & Sec Prior to Recovery Total Laboratory Safeguard & Sec Total 
Organizational Unit of Rate Rate of Rate Rate Rate   G&A   Expense   Assessment   FCR   Factor   with FCR   G&A   Assessment    
   
Section A: Central Lab Recharge Services    
   
Dept of Chemistry
   
Glassblowing Services  $       111.95    $                        132.05  $              132.05 41.2000        173.2500           3.9600      177.2100             5.3200        182.5300        35.9836       3.9615     171.9951
             
   
Copy Service  60.80   58.40 58.40 18.22 76.62 1.75 78.37 2.35 80.72 15.91 1.75 76.07
   
Central Shop Rates    
Central Shop Standard Rate 99.40[1]   109.50 109.50 34.16 143.66 3.29 146.95 4.41 151.36 29.84 3.29 142.62
             
C/S Assigned Rate 89.15   98.10 98.10 30.61 128.71 2.94 131.65 3.95 135.60 26.73 2.94 127.78
   
C/S Premium Rate 111.25   122.40 122.40 38.19 160.59 3.67 164.26 4.93 169.19 33.35 3.67 159.43
   
Plant Engineering Rates    
Building Trades Shops  (Standard) 83.20   88.95 88.95 27.75 116.70 2.67 119.37 3.58 122.95 24.24 2.67 115.86
             
Building Trades Shops  (Assigned) 67.05   69.10 69.10 21.56 90.66 2.07 92.73 2.78 95.51 18.83 2.07 90.00
             
General Labor 54.95   55.60 55.60 17.35 72.95 1.67 74.62 2.24 76.85 15.15 1.67 72.42
   
Engineering Construction Services  100.95   106.65 106.65 33.27 139.92 3.20 143.12 4.29 147.42 29.06 3.20 138.91
   
   
Plant Engineering Division - Charge for Space Maint. & Fuel    
   
1. Storage Space (per year) 4.30   5.00 5.00 1.97 6.97 0.15 7.12 0.21 7.34 1.78 0.15 6.93
                 
2. Industrial Space (per year) 11.39   13.25 13.25 5.23 18.48 0.40 18.87 0.57 19.44 4.70 0.40 18.35
 
                 
3. Laboratory/Office  (per year)  16.79   19.50 19.50 7.69 27.19 0.59 27.78 0.83 28.61 6.92 0.59 27.01
   
-Fuel Surcharge  16.6% of Space Rate   20.3%
   
-Exception to above space codes (1, 2 and 3) : see final page for detail     
   
Information & Technology Division               
   
CCD Technicians Services 100.65   100.45 100.45 31.34 131.79 3.01 134.80 4.04 138.85 27.37 3.01 130.84
   
Section A: Central Lab Recharge Services    
Sefety & Environmental Protection Dept.    
Personal Monitor-Rates
   
   a.      Whole Body Count (Rate per Count)  599.35   651.00 651.00 203.11 854.11 19.53 873.64 26.21 899.85 177.40 19.53 847.93
   b.      Off-Site Bioassay (Per Bioassay) 453.30   575.15 575.15 179.45 754.60 17.25 771.85 23.16 795.01 156.73 17.25 749.13
   c.      Lost Dosimeter Replacement (Per Replacement 257.80   264.35 264.35 82.48 346.83 7.93 354.76 10.64 365.40 72.04 7.93 344.32
   d.       Ring Dosimeter (Per Dosimeter) 29.55   27.85 27.85 8.69 36.54 0.84 37.37 1.12 38.50 7.59 0.84 36.27
   f.      TLD Chip(Per Chip) 84.70   85.30 85.30 26.61 111.91 2.56 114.47 3.43 117.91 23.24 2.56 111.10
   g.      TLD Plus Neutron(Per Dosimeter) 207.30   205.95 205.95 64.26 270.21 6.18 276.38 8.29 284.68 56.12 6.18 268.25
   h.        Basic TLD(Per Dosimeter) 25.15   24.35 24.35 7.60 31.95 0.73 32.68 0.98 33.66 6.64 0.73 31.72
            0.00         0.00
Field Sampling team Rate             0.00         0.00
  a.        Sample Team(Per Hour) 69.85   75.30 75.30 23.49 98.79 2.26 101.05 3.03 104.08 20.52 2.26 98.08
Facility Support Services
            0.00         0.00
- Professional Reps
99.00   99.85 99.85 31.15 131.00 3.00 134.00 4.02 138.02 27.21 3.00 130.05
- Radiation Control Technicians (RCT) 62.70   67.30 67.30 21.00 88.30 2.02 90.32 2.71 93.03 18.34 2.02 87.66
- RCT Overtime
73.45   80.20 80.20 25.02 105.22 2.41 107.63 3.23 110.86 21.85 2.41 104.46
Note: Jr. Tech rate is eliminated and it rolled into RCT rate.     
Instrumentation & Calibration 1
   
Hourly rate used for Allocation 144.90           0.00         0.00
Special Service Rate
122.90           0.00         0.00
Waste Mgmt Dept    
   Respirator Rate(Per Respirator)
54.40   64.95 64.95 20.26 85.21 1.95 87.16 2.61 89.78 17.70 1.95 84.60
   Waste Mgmt Professional Rate 83.35   92.35 92.35 28.81 121.16 2.77 123.93 3.72 127.65 25.17 2.77 120.29
   Waste Mgmt Tech  Rate 58.40   62.10 62.10 19.38 81.48 1.86 83.34 2.50 85.84 16.92 1.86 80.89
Hazardous & Industrial Rate    
   Non Hazardous waste per drum    
Will be published but departments will get charge via monthly allocation.
      0.00
   Hazardous waste per drum                     0.00
   Hazardous normal labpack per lbs.                     0.00
Rad Solid    
   Compactible Rad waste per cubic Ft.                     0.00
   Non-Compactible Rad waste per cubic Ft.    
 
              0.00
High Activity (Radioactive) waste per cubic Ft. 19,362.95   6,959.15 6,959.15 2,171.25 9,130.40 208.77 9,339.18 280.18 9,619.35 1,896.37 208.77 9,064.29
Rad Liquid    
   Rad liquid per gallon                     0.00
Mixed Waste     Will be published but departments will get charge via monthly allocation.
   Lead per cubic Ft.                     0.00
   Non-lead Mixed per cubic Ft.                     0.00
   
Section B: Other Services    
SCIENTIFIC DEVICES              
             
Cyclotron               
     Cost per hour 367.30   390.80 390.80 154.17 544.97 11.72 556.69 16.70 573.40 138.73 11.72 541.26
           
Tandem Van de Graaff -  MP-6              
     Cost per hour 525.95 47.90 541.75 62.20 603.95 213.72 817.67 16.25 833.92 25.02 858.94 192.32 16.25 812.52
                             

Tandem User Labor Rate
           
Scientist 96.05   99.65 99.65 39.31 138.96 2.99 141.95 4.26 146.21 35.38 2.99 138.02
Technical Rate 70.05   72.85 72.85 28.74 101.59 2.19 103.77 3.11 106.89 25.86 2.19 100.90
   
Bruker AM-300 NMR Spectrometer              
     Cost per hour 19.78   20.35 20.35 8.03 28.38 0.61 28.99 0.87 29.86 7.22 0.61 28.18
                 
     User Training Fee 475.05   495.90 495.90 195.63 691.53 14.88 706.41 21.19 727.60 176.04 14.88 686.82
             
Magnetic Resonance Imaging (MRI)              
     Cost per hour 262.65   236.25 236.25 93.20 329.45 7.09 336.54 10.10 346.63 83.87 7.09 327.21
   
Dept of Chemistry    
Scientist 88.55   90.25 90.25 35.60 125.85 2.71 128.56 3.86 132.42 32.04 2.71 125.00
Technical Rate 54.95   54.15 54.15 21.36 75.51 1.62 77.14 2.31 79.45 19.22 1.62 75.00
   
National Synchrotron Light Source2                              
     Shift Cost per NSLS Station (8 Hours)
530.20 42.35 530.20 [2] 42.35 572.55   209.16   781.71   15.91   797.62   23.93   821.55   188.22   15.91   776.68
   
Capillary Adsorption Tube Sampler (CATS)    
     A- per project 2445.75   2477.25 2,477.25 977.28 3,454.53 74.32 3,528.84 105.87 3,634.71 879.42 74.32 3,430.99
     B- per house period 88.00   89.40 89.40 35.27 124.67 2.68 127.35 3.82 131.17 31.74 2.68 123.82
     C- per CATS 105.55   106.85 106.85 42.15 149.00 3.21 152.21 4.57 156.77 37.93 3.21 147.99
     D- per source/MO   2.45   2.50 2.50 0.99 3.49 0.08 3.56 0.11 3.67 0.89 0.08 3.46
     E- CATS bake/check 15.30   15.80 15.80 6.23 22.03 0.47 22.51 0.68 23.18 5.61 0.47 21.88
     F- pollutant sources -per N + 1 zone 11.05   11.30 11.30 4.46 15.76 0.34 16.10 0.48 16.58 4.01 0.34 15.65
     G- CATS HC Oxidation 75.30   77.60 77.60 30.61 108.21 2.33 110.54 3.32 113.86 27.55 2.33 107.48
             
Non Returned Items - One Time Fee      
     A- CATS 21.40   21.90 21.90 8.64 30.54 0.66 31.20 0.94 32.13 7.77 0.66 30.33
     B- Source 21.05   21.60 21.60 8.52 30.12 0.65 30.77 0.92 31.69 7.67 0.65 29.92
     C- Tray 5.00   5.00 5.00 1.97 6.97 0.15 7.12 0.21 7.34 1.78 0.15 6.93
   
Metallurgical Services 114.55   119.10 119.10 46.99 166.09 3.57 169.66 5.09 174.75 42.28 3.57 164.95
   
Dept. of EENS    
Senior Scientist 175.95   183.05 183.05 72.21 255.26 5.49 260.75 7.82 268.58 64.98 5.49 253.52
Scientist 144.15   148.94 148.94 58.76 207.70 4.47 212.17 6.37 218.53 52.87 4.47 206.28
Engineer/Professional 136.80   141.40 141.40 55.78 197.18 4.24 201.42 6.04 207.47 50.20 4.24 195.84
Technical Rate 84.85   88.35 88.35 34.85 123.20 2.65 125.85 3.78 129.63 31.36 2.65 122.36
Secretarial Rate 60.90   62.80 62.80 24.77 87.57 1.88 89.46 2.68 92.14 22.29 1.88 86.98
       
Computational Science Center     
Computational Science Support Rate (Visualization) 107.20   109.80 109.80 43.32 153.12 3.29 156.41 4.69 161.10 38.98 3.29 152.07
Section B: Other Services    
   
Office of Intellectual Property & Industrial Partnership     
       Per Hour 324.90   347.90 347.90 137.25 485.15 10.44 495.58 14.87 510.45 123.50 10.44 481.84
     
Glassblowing Services 111.95   132.05 132.05 52.09 184.14 3.96 188.11 5.64 193.75 46.88 3.96 182.89
   
STAFF SERVICES DIVISION                                  
                                 
Demonstration Fee (Two Tables) (Per Day) 131.75   137.20 137.20 54.13 191.33 4.12 195.44 5.86 201.30 48.71 4.12 190.02
                       
Each Additional Table (Per Day) 19.30   19.90 19.90 7.85 27.75 0.60 28.35 0.85 29.20 7.06 0.60 27.56
   
Conference Personnel OT Rate 48.10   50.10 50.10 19.76 69.86 1.50 71.37 2.14 73.51 17.79 1.50 69.39
   
Conference Personnel Double Time Rate 63.80   66.45 66.45 26.21 92.66 1.99 94.66 2.84 97.50 23.59 1.99 92.03

   
Chauffeur Straight Time Hourly Rate     
     cost per hour 48.75   50.50 50.50 19.92 70.42 1.52 71.94 2.16 74.10 17.93 1.52 69.94
               
Chauffeur Overtime Hourly Rate    
     cost per hour 61.70   63.95 63.95 25.23 89.18 1.92 91.10 2.73 93.83 22.70 1.92 88.57
               
Motor Vehicle Mechanics Rate    
     cost per hour 79.40   82.50 82.50 32.55 115.05 2.48 117.52 3.53 121.05 29.29 2.48 114.26
             
Automotive Rental Rate (using the Enterprise Rents)              
Off-Site per day  39.00   40.00 40.00 15.78 55.78 1.20 56.98 1.71 58.69 14.20 1.20 55.40
On-Site per day 33.00   34.00 34.00 13.41 47.41 1.02 48.43 1.45 49.89 12.07 1.02 47.09
On-Site 1/2 day 18.00   19.00 19.00 7.50 26.50 0.57 27.07 0.81 27.88 6.75 0.57 26.32
Off-Site 1/2 day 20.00   21.00 21.00 8.28 29.28 0.63 29.91 0.90 30.81 7.46 0.63 29.09
   
Assigned Motor Vehicle Rate    
Sedan/Wagon/Pickup/Van/Truck 477.00   501.00 501.00 197.64 698.64 15.03 713.67 21.41 735.08 177.86 15.03 693.89
Security Vehicle 691.00   726.00 726.00 286.41 1,012.41 21.78 1,034.19 31.03 1,065.21 257.73 21.78 1,005.51
Ambulance/Fire 577.00   606.00 606.00 239.07 845.07 18.18 863.25 25.90 889.14 215.13 18.18 839.31
Utility 334.00   351.00 351.00 138.47 489.47 10.53 500.00 15.00 515.00 124.61 10.53 486.14
   
Fiscal Services Division
   
Airline Ticket surcharge - per ticket  20.00   20.00 20.00 7.89 27.89 0.60 28.49 0.85 29.34 7.10 0.60 27.70
Note: The charge will apply to all issued tickets.     
   
Section B: Other Services
   
   
Vet Services Facility (Medical Dept.)    
   
Maintenance Cost (Per Day)                    
     Mouse 0.30   0.30 0.30 0.12 0.42 0.01 0.43 0.01 0.44 0.11 0.01 0.42
     Rat 0.55   0.65 0.65 0.26 0.91 0.02 0.93 0.03 0.96 0.23 0.02 0.90
     Rabbit 1.60   4.65 4.65 1.83 6.48 0.14 6.62 0.20 6.82 1.65 0.14 6.44
     Baboon 13.20   14.55 14.55 5.74 20.29 0.44 20.73 0.62 21.35 5.17 0.44 20.16
Monkey 9.30   9.75 9.75 3.85 13.60 0.29 13.89 0.42 14.31 3.46 0.29 13.50
Extra Care mouse 0.50   0.85 0.85 0.34 1.19 0.03 1.22 0.04 1.26 0.30 0.03 1.18
Animal Receiving 36.60   37.80 37.80 11.79 49.59 14.91 52.71 1.58 54.29
               
FY 05 Space charge Rates
DESCRIPTION  SPACE CODE   RATE ($)*
Common Space (Corridors, bathrooms, electrical and mechanical space associated with the operation of the building). 0.00   0.00
Normally unoccupied space, including programmatic equipment support spaces, electrical and mechanical space associated with the operation of the program, and storage spaces. 1.00   4.30
Normally occupied spaces, including industrial spaces, such as machine shops, tech and craft shop areas, nonlaboratory high-bay industrial areas, such as manufacturing, testing, and assembly areas, and commercial-type space, such as the Research Library or other building spaces originally designed as a library. 2.00   11.39
Normally occupied space, including offices, laboratories, conference rooms, and local libraries. 3.00   16.79
             Normally inaccessible spaces occupied by large research machines including associated tunnels and caves. 4.00   0.00
Housing. All maintenance is charged back to the Staff Services Division. 5.00   0.00
Same as Type 1 space, except occupant pays for all maintenance. Responsible organization must have an "Open Work Order" with Plant Engineering so that maintenance costs can be charged. 11.00   0.00                  
Same as Type 2 space, except occupant pays for all maintenance. Responsible organization must have an "Open Work Order" with Plant Engineering so that maintenance costs can be charged. 12.00   0.00                  
Same as Type 3 space, except occupant pays for all maintenance. Responsible organization must have an "Open Work Order" with Plant Engineering so that maintenance costs can be charged. 13.00   0.00
               


[1]
Shantilata Subudhi:
FY 05 Mid Year rate was $108.00
[2]
Shantilata Subudhi:
FY 06  interim rate.