BROOKHAVEN NATIONAL LABORATORY
FY 2007 STANDARD RATES
Effective October 1, 2006
  BNL Users Only DOE Program Non DOE Program & NIH (New Proposal)  NIH Program (Existing grants only)/Exempted WFO agencies
Organizational Unit Direct Portion of Rate Machine Power Rate Total Rate Laboratory G&A Total Expense Safeguard & Sec Assessment Total Prior to FCR 3% Full Cost Recovery Factor Total with FCR Laboratory G&A Safeguard & Sec Assessment Total 
Section A: Central Lab Recharge Services                                        
Dept of Chemistry
 
                         
Glassblowing Services $124.50   $124.50   $38.84   $163.34   $3.74 $167.08   $5.01   $172.09   $38.84   $3.74   $167.08
CEG&PA
                         
Copy Service  55.70   55.70   17.38   73.08   1.67 74.75   2.24   76.99   17.38   1.67   74.75
Central Shop Rates:                            
Central Shop Standard Rate 113.90   113.90   35.54 149.44   3.42 152.85   4.59 157.44   35.54   3.42   152.85
C/S Assigned Rate 102.05   102.05   31.84 133.89   3.06 136.95   4.11 141.06   31.84   3.06   136.95
C/S Premium Rate 127.30   127.30   39.72   167.02   3.82 170.84   5.13   175.96   39.72   3.82   170.84
Plant Engineering Rates:
                         
Building Trades Shops  (Standard) 91.95   91.95   28.69 120.64   2.76 123.40   3.70 127.10   28.69   2.76   123.40
Building Trades Shops  (Assigned) 71.25   71.25   22.23 93.48   2.14 95.62   2.87 98.49   22.23   2.14   95.62
General Labor 56.55   56.55   17.64 74.19   1.70 75.89   2.28 78.17   17.64   1.70   75.89
Engineering Construction Services 
109.40
  109.40   34.13   143.53   3.28 146.81   4.40   151.22   34.13   3.28   146.81
Plant Engineering Division - Charge for Space Maint. & Fuel                            
1. Storage Space (per year)
5.25
  5.25   2.07 7.32   0.16 7.48   0.22 7.70   2.07   0.16   7.48
2. Industrial Space (per year) 13.95   13.95   5.50 19.45   0.42 19.87   0.60 20.47   5.50   0.42   19.87
3. Laboratory/Office  (per year) 
20.55
  20.55   8.11 28.66   0.62 29.27   0.88 30.15   8.11   0.62   29.27
-Fuel Surcharge  21.5%                          
-Deferred Maintenance Surcharge 14.50%                          
-Exception to above space codes (1, 2 and 3) : see the final page for detail                                         
Information & Technology Division                                   
CCD Technicians Services 100.10   100.10   31.23 131.33   3.00 134.33   4.03 138.36   31.23   3.00   134.33
Desktop Phone (Phone Jack) per jack/month 30.10   30.10   9.39   39.49   0.90 40.39   1.21   41.61   9.39   0.90   40.39
Section A: Central Lab Recharge Services                            
Safety & Environmental Protection Dept.                            
Personal Monitor-Rates:
                         
   a.      Whole Body Count (Rate per Count)  700.80   700.80   218.65 919.45   21.02 940.47   28.21 968.69   218.65   21.02   940.47
   b.      Off-Site Bioassay (Per Bioassay) 623.75   623.75   194.61 818.36   18.71 837.07   25.11 862.18   194.61   18.71   837.07
   c.      Lost Dosimeter Replacement (Per Replacement 273.60   273.60   85.36 358.96   8.21 367.17   11.02 378.19   85.36   8.21   367.17
   d.       Ring Dosimeter (Per Dosimeter) 28.60   28.60   8.92 37.52   0.86 38.38   1.15 39.53   8.92   0.86   38.38
   f.      TLD Chip (Per Chip) 91.30   91.30   28.49 119.79   2.74 122.52   3.68 126.20   28.49   2.74   122.52
   g.        Basic TLD (Per Dosimeter) 26.00   26.00   8.11   34.11   0.78 34.89   1.05   35.94   8.11   0.78   34.89
Field Sampling team Rate:                   0.00                   0.00
  a.        Sample Team (Per Hour) 77.85   77.85   24.29   102.14   2.34 104.47   3.13   107.61   24.29   2.34   104.47
Facility Support Services Rates:
              0.00                 0.00
- Professional Reps
98.80
  98.80   30.83 129.63   2.96 132.59   3.98 136.57   30.83   2.96   132.59
- Radiation Control Technicians (RCT) 70.25   70.25   21.92 92.17   2.11 94.28   2.83 97.10   21.92   2.11   94.28
- RCT Overtime
84.95
  84.95   26.50   111.45   2.55 114.00   3.42   117.42   26.50   2.55   114.00
Instrumentation & Calibration Rates:
                         
Hourly rate used for Allocation 155.20   155.20   48.42 203.62   4.66 208.28   6.25 214.53   48.42   4.66   208.28
Special Service Rate
131.65
  131.65   41.07   172.72   3.95 176.67   5.30   181.97   41.07   3.95   176.67
Waste Mgmt Dept                            
   Respirator Rate (Per Respirator)
66.00
  66.00   20.59 86.59   1.98 88.57   2.66 91.23   20.59   1.98   88.57
   Waste Mgmt Professional Rate 93.70   93.70   29.23 122.93   2.81 125.75   3.77 129.52   29.23   2.81   125.75
   Waste Mgmt Tech  Rate 66.30  
66.30
  20.69   86.99   1.99 88.97   2.67   91.64   20.69   1.99   88.97
Section B: Other Services                            
SCIENTIFIC DEVICES                                  
Tandem Van de Graaff -  MP-6                                
     Cost per hour 594.65 64.30 658.95   234.59 893.54   17.84 911.38   27.34 938.72   234.59   17.84   911.38
Tandem User Labor Rates:

 
                             
Scientist 111.70   111.70   44.07 155.77   3.35 159.12   4.77 163.89   44.07   3.35   159.12
Technical Rate 77.55   77.55   30.59 108.14   2.33 110.47   3.31 113.78   30.59   2.33   110.47
NSRL Hrly rate for non-NASA users[1] 3,114.55 [2] 469.04 3,583.59   1,103.54[3] 4,687.13   93.44 4,780.57   143.42 4,923.98   1,228.69   93.44   4,905.72
Dept of Chemistry - Labor Rates:                                  
Sr. Scientist 146.35   146.35   57.74 204.09   4.39 208.48   6.25 214.73   57.74   4.39   208.48
Jr. Scientist 91.60   91.60   36.14 127.74   2.75 130.48   3.91 134.40   36.14   2.75   130.48
Post Doc 42.35   42.35   16.71 59.06   1.27 60.33   1.81 62.14   16.71   1.27   60.33
Technical Rate 67.45   67.45   26.61   94.06   2.02 96.08   2.88   98.97   26.61   2.02   96.08
CFN Department - Labor Rates                                  
Sr. Scientist 172.45   172.45   68.03 240.48   5.17 245.66   7.37 253.02   68.03   5.17   245.66
Jr. Scientist 92.35   92.35   36.43 128.78   2.77 131.55   3.95 135.50   36.43   2.77   131.55
Post Doc 43.55   43.55   17.18 60.73   1.31 62.04   1.86 63.90   17.18   1.31   62.04
Technical Rate 57.20   57.20   22.57   79.77   1.72 81.48   2.44   83.93   22.57   1.72   81.48
CMPMS Department - Labor Rates                                  
Sr. Scientist 121.25   121.25   47.83 169.08   3.64 172.72   5.18 177.90   47.83   3.64   172.72
Jr. Scientist 94.30   94.30   37.20 131.50   2.83 134.33   4.03 138.36   37.20   2.83   134.33
Post Doc 40.90   40.90   16.14 57.04   1.23 58.26   1.75 60.01   16.14   1.23   58.26
Technical Rate 66.65   66.65   26.29   92.94   2.00 94.94   2.85   97.79   26.29   2.00   94.94
National Synchrotron Light Source                                  
     Shift Cost per NSLS Station (8 Hours)
519.85
47.10 566.95   205.08   772.03   15.60 787.63   23.63   811.26   205.08   15.60   787.63
Dept. of EENS
                         
Capillary Adsorption Tube Sampler (CATS)                            
     A- per project 2591.55   2,591.55   1,022.37 3,613.92   77.75 3,691.66   110.75 3,802.41   1,022.37   77.75   3,691.66
     B- per house period 92.15   92.15   36.35 128.50   2.76 131.27   3.94 135.21   36.35   2.76   131.27
     C- per CATS 112.85   112.85   44.52 157.37   3.39 160.75   4.82 165.58   44.52   3.39   160.75
     D- per source/MO   2.80   2.80   1.10 3.90   0.08 3.99   0.12 4.11   1.10   0.08   3.99
     E- CATS bake/check 17.95   17.95   7.08 25.03   0.54 25.57   0.77 26.34   7.08   0.54   25.57
     F- pollutant sources -per N + 1 zone 11.65   11.65   4.60 16.25   0.35 16.60   0.50 17.09   4.60   0.35   16.60
     G- CATS HC Oxidation 86.65   86.65   34.18   120.83   2.60 123.43   3.70   127.14   34.18   2.60   123.43
Non Returned Items - One Time Fee                            
     A- CATS 24.30   24.30   9.59 33.89   0.73 34.62   1.04 35.65   9.59   0.73   34.62
     B- Source 24.30   24.30   9.59 33.89   0.73 34.62   1.04 35.65   9.59   0.73   34.62
     C- Tray 5.00   5.00   1.97   6.97   0.15 7.12   0.21   7.34   1.97   0.15   7.12
Leak Hunt Rates:                            
Daily Rate 3,328.00   3,328.00   1,312.90 4,640.90   99.84 4,740.74   142.22 4,882.96   1,312.90   99.84   4,740.74
Mobilization Rate 5,708.42   5,708.42   2,251.97 7,960.39   171.25 8,131.64   243.95 8,375.59   2,251.97   171.25   8,131.64
Daily Replenishment Rate 1,057.60   1,057.60   417.22 1,474.82   31.73 1,506.55   45.20 1,551.75   417.22   31.73   1,506.55
Daily Consultation Rate 1,212.80   1,212.80   478.45 1,691.25   36.38 1,727.63   51.83 1,779.46   478.45   36.38   1,727.63
Overtime rate per Hr. 624.00   624.00   246.17   870.17   18.72 888.89   26.67   915.55   246.17   18.72   888.89
EENS Labor Rates:                            
Senior Scientist 189.45   189.45   74.74 264.19   5.68 269.87   8.10 277.97   74.74   5.68   269.87
Scientist 151.60   151.60   59.81 211.41   4.55 215.95   6.48 222.43   59.81   4.55   215.95
Jr. Scientist 89.45   89.45   35.29 124.74   2.68 127.42   3.82 131.24   35.29   2.68   127.42
Engineer/Professional 132.20   132.20   52.15 184.35   3.97 188.32   5.65 193.97   52.15   3.97   188.32
Technical Rate 92.25   92.25   36.39 128.64   2.77 131.41   3.94 135.35   36.39   2.77   131.41
Secretarial Rate 64.95   64.95   25.62   90.57   1.95 92.52   2.78   95.30   25.62   1.95   92.52
Section B: Other Services                            
Condensed Matter Physics & Materials Science Department                            
Metallurgical Services 117.35   117.35   46.29   163.64   3.52 167.17   5.02   172.18   46.29   3.52   167.17
Office of Intellectual Property & Industrial Partnership 
                         
       Per Hour  379.45   379.45   149.69   529.14   11.38 540.53   16.22   556.74   149.69   11.38   540.53
Staff Services Division                                              
Demonstration Fee (Two Tables) (Per Day) 139.90   139.90   55.19 195.09   4.20 199.29   5.98 205.27   55.19   4.20   199.29
Each Additional Table (Per Day) 20.25   20.25   7.99 28.24   0.61 28.85   0.87 29.71   7.99   0.61   28.85
Conference Personnel OT Rate 51.60   51.60   20.36 71.96   1.55 73.50   2.21 75.71   20.36   1.55   73.50
Conference Personnel Double Time Rate 68.75   68.75   27.12 95.87   2.06 97.93   2.94 100.87   27.12   2.06   97.93
Chauffeur Straight Time Hourly Rate 

51.05
  51.05   20.14 71.19   1.53 72.72   2.18 74.90   20.14   1.53   72.72
Chauffeur Overtime Hourly Rate 64.65   64.65   25.50 90.15   1.94 92.09   2.76 94.86   25.50   1.94   92.09
Motor Vehicle Mechanics Hourly Rate 89.10   89.10   35.15   124.25   2.67 126.92   3.81   130.73   35.15   2.67   126.92
Automotive Rental Rate (using the Enterprise Rents)                                  
Off-Site per day  41.00   41.00   16.17 57.17   1.23 58.40   1.75 60.16   16.17   1.23   58.40
On-Site per day 35.00   35.00   13.81 48.81   1.05 49.86   1.50 51.35   13.81   1.05   49.86
On-Site 1/2 day 20.00   20.00   7.89 27.89   0.60 28.49   0.85 29.34   7.89   0.60   28.49
Off-Site 1/2 day 22.00   22.00   8.68   30.68   0.66 31.34   0.94   32.28   8.68   0.66   31.34
Assigned Motor Vehicle Rate                            
Sedan/Wagon/Pickup/Van/Truck 508.00   508.00   200.41 708.41   15.24 723.65   21.71 745.36   200.41   15.24   723.65
Security Vehicle 737.00   737.00   290.75 1,027.75   22.11 1,049.86   31.50 1,081.35   290.75   22.11   1,049.86
Ambulance/Fire 615.00   615.00   242.62   857.62   18.45 876.07   26.28   902.35   242.62   18.45   876.07
Fiscal Services Division
 
                         
Airline Ticket surcharge - per ticket  20.00   20.00   7.89 27.89   0.60 28.49   0.85 29.34   7.89   0.60   28.49
Note: The charge will apply to all issued tickets.                                         
Medical Dept. - Vet Services Facility 
                         
Maintenance Cost (Per Day)                                         
     Mouse 0.35   0.35   0.14 0.49   0.01 0.50   0.02 0.52   0.14   0.01   0.50
     Rat 0.85   0.85   0.34 1.19   0.03 1.22   0.04 1.26   0.34   0.03   1.22
     Rabbit 5.70   5.70   2.25 7.95   0.17 8.12   0.24 8.36   2.25   0.17   8.12
     Baboon 16.95   16.95   6.69 23.64   0.51 24.15   0.72 24.87   6.69   0.51   24.15
Monkey 12.50   12.50   4.93 17.43   0.38 17.81   0.53 18.34   4.93   0.38   17.81
Extra Care mouse 1.00   1.00   0.39 1.39   0.03 1.42   0.04 1.46   0.39   0.03   1.42
Extra Care rat 1.30   1.30   0.51 1.81   0.04 1.85   0.06 1.91   0.51   0.04   1.85
Animal Receiving 39.15   39.15   12.21   51.36   15.44 54.59   1.64   56.23            
FY 07 Space charge Rates                                        
DESCRIPTION  RATE ($)*  
Common Space (Corridors, bathrooms, electrical and mechanical space associated with the operation of the building). 0.00  
Normally unoccupied space, including programmatic equipment support spaces, electrical and mechanical space associated with the operation of the program, and storage spaces. 5.25
 
Normally occupied spaces, including industrial spaces, such as machine shops, tech and craft shop areas, nonlaboratory high-bay industrial areas, such as manufacturing, testing, and assembly areas, and commercial-type space, such as the Research Library or other building spaces originally designed as a library. 13.95  
Normally occupied space, including offices, laboratories, conference rooms, and local libraries. 20.55
 
Normally inaccessible spaces occupied by large research machines including associated tunnels and caves. 0.00  
Housing. All maintenance is charged back to the Staff Services Division. 0.00  
Same as Type 1 space, except occupant pays for all maintenance. Responsible organization must have an "Open Work Order" with Plant Engineering so that maintenance costs can be charged. 0.00                    
Same as Type 2 space, except occupant pays for all maintenance. Responsible organization must have an "Open Work Order" with Plant Engineering so that maintenance costs can be charged. 0.00                    
Same as Type 3 space, except occupant pays for all maintenance. Responsible organization must have an "Open Work Order" with Plant Engineering so that maintenance costs can be charged. 0.00                                      
                                         
               


[1]
Shantilata Subudhi:
New Rate as of 2-16-07
[2]
Shantilata Subudhi:
Direct plus Decontamination/decommissioning rates per hr.
[3]
Shantilata Subudhi:
Manually entered G&A amt because part of the costs includes central recharges which gets lower G&A rate (31.2%); therefore, full G&A rate (39.45%) cannot apply to the direct costs.