0.3945 Full G&A 0.312 LW NIH G&A
0.312 LW Serv G&A 0.395 Full NIH G&A
0.030 FCR
0.030 Safeg&Sec
this line and data above not included in print out
BROOKHAVEN NATIONAL LABORATORY
FY 2007 STANDARD RATES
Effective October 1, 2006
  BNL Users Only DOE Program Non DOE Program & NIH (New Proposal)  NIH Program (Existing grants only)/Exempted WFO agencies
Organizational Unit Direct Portion of Rate Machine Power Rate Total Rate Laboratory G&A Total Expense Safeguard & Sec Assessment Total Prior to FCR 3% Full Cost Recovery Factor Total with FCR Laboratory G&A Safeguard & Sec Assessment Total 
Section A: Central Lab Recharge Services                                        
Dept of Chemistry
 
                         
Glassblowing Services $124.50   $124.50   $38.84   $163.34   $3.74 $167.08   $5.01   $172.09   $38.84   $3.74   $167.08
CEG&PA
                         
Copy Service  55.70   55.70   17.38   73.08   1.67 74.75   2.24   76.99   17.38   1.67   74.75
Central Shop Rates:                            
Central Shop Standard Rate 113.90   113.90   35.54 149.44   3.42 152.85   4.59 157.44   35.54   3.42   152.85
C/S Assigned Rate 102.05   102.05   31.84 133.89   3.06 136.95   4.11 141.06   31.84   3.06   136.95
C/S Premium Rate 127.30   127.30   39.72   167.02   3.82 170.84   5.13   175.96   39.72   3.82   170.84
Plant Engineering Rates:
                         
Building Trades Shops  (Standard) 91.95   91.95   28.69 120.64   2.76 123.40   3.70 127.10   28.69   2.76   123.40
Building Trades Shops  (Assigned) 71.25   71.25   22.23 93.48   2.14 95.62   2.87 98.49   22.23   2.14   95.62
General Labor 56.55   56.55   17.64 74.19   1.70 75.89   2.28 78.17   17.64   1.70   75.89
Engineering Construction Services 
109.40
  109.40   34.13   143.53   3.28 146.81   4.40   151.22   34.13   3.28   146.81
Plant Engineering Division - Charge for Space Maint. & Fuel                            
1. Storage Space (per year)
5.25
  5.25   2.07 7.32   0.16 7.48   0.22 7.70   2.07   0.16   7.48
2. Industrial Space (per year) 13.95   13.95   5.50 19.45   0.42 19.87   0.60 20.47   5.50   0.42   19.87
3. Laboratory/Office  (per year) 
20.55
  20.55   8.11 28.66   0.62 29.27   0.88 30.15   8.11   0.62   29.27
-Fuel Surcharge  21.5%                          
-Deferred Maintenance Surcharge 14.50%                          
-Exception to above space codes (1, 2 and 3) : see the final page for detail                                         
Information & Technology Division                                   
CCD Technicians Services 100.10   100.10   31.23 131.33   3.00 134.33   4.03 138.36   31.23   3.00   134.33
Desktop Phone (Phone Jack) per jack/month 30.10   30.10   9.39   39.49   0.90 40.39   1.21   41.61   9.39   0.90   40.39
Section A: Central Lab Recharge Services                            
Safety & Environmental Protection Dept.                            
Personal Monitor-Rates:
                         
   a.      Whole Body Count (Rate per Count)  700.80   700.80   218.65 919.45   21.02 940.47   28.21 968.69   218.65   21.02   940.47
   b.      Off-Site Bioassay (Per Bioassay) 623.75   623.75   194.61 818.36   18.71 837.07   25.11 862.18   194.61   18.71   837.07
   c.      Lost Dosimeter Replacement (Per Replacement 273.60   273.60   85.36 358.96   8.21 367.17   11.02 378.19   85.36   8.21   367.17
   d.       Ring Dosimeter (Per Dosimeter) 28.60   28.60   8.92 37.52   0.86 38.38   1.15 39.53   8.92   0.86   38.38
   f.      TLD Chip (Per Chip) 91.30   91.30   28.49 119.79   2.74 122.52   3.68 126.20   28.49   2.74   122.52
   g.        Basic TLD (Per Dosimeter) 26.00   26.00   8.11   34.11   0.78 34.89   1.05   35.94   8.11