Attendees : M. Blaskiewicz, J. Brodowski, A. Fedotov, Y. Y. Lee, H. Ludweig, John Jackson, N. Malitsky,
W. McGahern D. Raparia, G. Parzen, S. Tepikian, N. Tsoupas, J. Wei, S. Y. Zang
BIG kicker rise time presently is 30 ns, to make is 20 ns about $40k R&D is needed
Sarah has done simulation (1) (2) (3) (4) (5) (6). Based on these results it was decided that
30 ns rise time is good enough.
Parzen presented the guide line for IPM magnet Multipoles. IPM Magnet
Tsoupas reported Chicane number 4 magnet measurement results, It need one more iteration.
Jain discussed the magnetic center verse mechanical center of the 21Q40 Quadrupoles.
It was decided that because the differences in these are too small,
there is no need to survey the magnetic measurement probe.
Later, Jain also send the plane for measuring the interference between quads and various correctors.