OU III ESD for Building 96

July 2009

This Explanation of Significant Differences (ESD) was prepared to describe the proposed changes to the Building 96 groundwater remedy to include excavation and off-site disposal of contaminated soils. This will optimize the remedy by reducing the number of years of active treatment and enable BNL to achieve the Operable Unit III Record of Decision cleanup goal for this groundwater plume by meeting drinking water standards for volatile organic compounds by 2030. The Building 96 Explanation of Significant Differences was finalized on July 16, 2009.

Documents / Links

Building 96 ESD