At Area A, the section know as A-2 has been dewatered with a large capacity pump. The water was temporarily detoured to the HQ Measuring Station. The dewatering enables more effective vacuum guzzling. When the vacuum guzzling is complete, the flow of the river will be returned to its natural state.