ERD Home
Peconic River Project
Groundwater Projects
Surface Projects
Brookhaven Graphite Research Reactor
High Flux Beam Reactor
Waste Management Division
Operable Unit I
Operable Unit I Remedial Design (5/01) - PDF format also available
In-situ Vitrification (5/01) - PDF format also available
Final report on a fire (3/11/2000) in a debris pile located in the southeastern portion of the BNL site (5/00)
Operable Unit I: Feasibility Study and Proposed Plan (4/99)
Operable Unit I/VI: Remedial Investigation and Risk Assessment of the Southeast Area of the Laboratory (Initial distribution: 8/96; updated: 10/96)
Operable Unit I: Engineering Evaluation and Cost Analysis (1/96)
Operable Unit II/VII
Operable Unit II/VII: Remedial Investigation Report (2/99)