TABLE ES-6

SUMMARY OF COST ESTIMATES FOR
REMEDIAL ALTERNATIVES

 

ALTERNATIVE CAPITAL COSTS* TOTAL O&M
PRESENT WORTH COST*
NET PRESENT WORTH
AT 7% RATE*
Alternative 1.
No Action with Monitoring
$52,200 $865,200 $917,400
Alternative 2.
Engineered Cell
$8,002,000 $1,234,000 $9,236,000
Alternative 3.
Moderate Excavation, Off-site Disposal, and RCRA Cap
$14,520,000 $982,200 $15,510,000
Alternative 4.
Large-scale Excavation and Off-site Disposal
$24,130,000 $489,900 $24,620,000
Alternative 5.
Moderate Excavation, Soil Washing, Off-site Disposal, and RCRA Cap
$14,910,000 $982,200 $15,900,000
Alternative 6.
Moderate In-situ Vitrification and RCRA Cap
$19,160,000 $982,200 $20,140,000


Notes:

* Rounded-off figures (net present worth cost does not always equal sum of capital and O&M cost).
7% discount rate after inflation is used for present worth figures.
All monitoring costs are determined using a duration of 100 years except for Alternative 4 which uses a duration of 50 years.