Remediation roundup
The Laboratory currently has three treatment systems operating 24 hours
a day to clean up groundwater on the site. The following is an update on
the total amounts of groundwater treated by each system and the amount of
contaminants removed from the sole-source aquifer.
- Removal Action V Pump-and-Treat System (operating since 12/96):
- 620,000,000 gallons of groundwater treated by air stripper and recharged
- Operable Unit III Pump-and-Treat System (operating since 6/97):
- 450,000,000 gallons of groundwater treated by air stripper and recharged
- Tritium Remediation System (operating since 5/97):
- 90,000,000 gallons of water treated by carbon filters (to remove VOCs)
and recharged
- Further southward movement of High Flux Beam Reactor tritium plume
curtailed
To date, more than one billion gallons of groundwater have been treated,
and more than 750 pounds of contaminants have been removed from the sole
source aquifer.