1. Task Proposal
1.1 Task Proposal ID:
07/ICA-002 Date received in SPA:
2007-08-09
1.2 Task Title:
Expert (P3) -
Senior
Safeguards
Technology Analyst
1.3 Requester/Division/Section:
Lepingwell / SGIM / ICA
1.4 Is this a CFE task?
Yes
1.5 Task Category:
D
1.6 Is this a joint task for MSSPs? No
1.7 Is multiple acceptance required? No
If 1.6 or 1.7 is yes, indicate the reason:
2. Project:
2.1 Project ID: SGIM-003
Project Type:
2.2 Project Title:
Information from Open Sources
2.3 Project Manager/ Division / Section:
Lepingwell / SGIM / ICA
3. Safeguards Requirement Identification
The
3.1 What is needed, why and when:
3.2 How will the task results be used and by whom?
The research results will be used by SGIM and the operations divisions as input into State Evaluations, to support inspection and complementary access activities, and in ongoing Agency investigations into procurement networks. The task will also allow SGIM to develop enhanced skills in scientific and technical information collection strategies and information analysis. CFE support for State Evaluations will be utilized in the preparation of State Evaluation reports which form a basis for the Department's annual conclusions on Safeguards Implementation in States.
3.3 Consequences if task is not performed:
SGIM will not be able to provide in-depth research required for State Evaluation and the drawing of strengthened safeguards conclusions. The preparation of ad hoc reports on proliferation and safeguards issues derived from open sources and State declared information would also be less timely. Furthermore, SGIM would not be able to strengthen the information collection capability and the technical expertise of its staff.
4. IAEA Proposed Work Outline:
4.1 Major task stages with timing:
The following major tasks will be performed
throughout the duration of the expert's contract.
4.2 Support Division(s) / Section(s): SGIM / ICA
4.3 End User Division(s) / Section(s):
SG / ALL
SGIM /ICA
4.4 Estimated duration in months: 24
5. Safeguards Approval Process - not displayed
6. Acceptance by MSSP(s) - under review
6.1 MSSP(s) to which task is proposed: Date accepted: Agency Task ID:
AUL
CAN
FRA
GER
JPN
ROK
RUS
UK
USA
SPRlCS- Support Programme Information and Communication System