SP-l/ Junior Professional Officer Request
Request for Proposal from the IAEA
Click here for the Job Description
1. Task Proposal
1.1 Task Proposal ID:
07/TTS-008 Date received in SPA:
2008-01-14
1.2 Task Title:
Junior Professional Officer - Safeguards Analytical Services
1.3 Requester/Division/Section:
Lafolie / SGTS / TTS
1.4 Is this a CFE task?
No
1.5 Task Category:
A
1.6 Is this a joint task for MSSPs? No
1.7 Is multiple acceptance required? No
If 1.6 or 1.7 is yes, indicate the reason:
2. Project:
2.1 Project ID: SGTS-006
Project Type:
2.2 Project Title:
Destructive Analysis of Nuclear Materials for Safeguards
2.3 Project Manager/ Division / Section: Lafolie / SGTS / TTS
3. Safeguards Requirement Identification
3.1 What is needed, why and when:
The assistance of a Junior Professional Officer is needed to assist in the
Section for Technical Support Coordination (TTS). Division of Technical
Support to carry out the objectives of the R&D Project SGTS 006 (Destructive
Analysis of Nuclear Material for SG) with, in particular, the development of the
Network of Analytical Laboratories (NWAL) for nuclear material analysis.
The JPO will assist in the development of managerial tools for coordination of
the distribution of the analytical samples within NWAL and maintain an
associated documentation. This development should be consistent with the
quality manual requirements and will require a detailed technical assessment of
the current NWAL arrangements.
3.2 How will the task results be used and by whom?
The results will be used by the Department of Safeguards to more effectively monitor the information and increase the coordination between SGTS/TTS, SGIM/IDS, the Seibersdorf Laboratory and the members of the NWAL.
3.3 Consequences if task is not performed:
Lack of coordination between the different actors in the process of distribution of samples within the NWAL could generate additional delays in the analytical chain.
4. IAEA Proposed Work Outline:
4.1 Major task stages with timing:
July 2008 - Definition of the project needs
August 2008 - Design of the new proposal
December 2008 - Implementation of the new proposal
March 2009 - Evaluation of the performance
4.2 Support Division(s) / Section(s): SGTS / TTS
4.3 End User Division(s) / Section(s):
SGIM/ IDS
SGTS/ TIL, TTS
4.4 Estimated duration in months: 12
5. Safeguards Approval Process - not displayed
6. Acceptance by MSSP(s)
6.1 MSSP(s) to which task is proposed: Date accepted: Agency Task ID:
USA
SPRlCS- Support Programme Information and Communication System