SP-l TASK PROPOSAL
1. Task Proposal
1.1 Task Proposal ID:
08/ICA-013 Date received in SPA:
2008-04-29
1.2 Task Title:
Junior Professional Officer - Open Source Information Analysis
1.3 Requester/Division/Section:
Lepingwell / SGIM / ICA
1.4 Is this a CFE task?
No
1.5 Task Category:
D
1.6 Is this a joint task for MSSPs? No
1.7 Is multiple acceptance required? No
If 1.6 or 1.7 is yes, indicate the reason:
2. Project:
2.1 Project ID: SGIM-003
Project Type:
2.2 Project Title: Information
from Open Sources
2.3 Project Manager/ Division / Section:
Lepingwell / SGIM / ICA
3. Safeguards Requirement Identification
A Junior Professional Officer is required to assist with the review and analysis
of open source information. The increasing quantity of information of
safeguards relevance requires extensive analysis in order to contribute to
safeguards conclusions. A JPO with training in information analysis and
evaluation would be able to assist in reviewing incoming information and
conducting initial assessments and analysis. The JPO is required by Summer
2008 in order to ensure that tasks performed by the current JPO are continued
without interruption.
3.1 What is needed, why and when:
3.2 How will the task results be used and by whom?
The Department's increased capabilities in open source information collection require an equivalent increase in the ability to review and analyze the collected information, especially in order to provide input to the state evaluation process. Under the guidance of a Senior Information Analyst, the JPO will conduct initial evaluation and analysis of information and produce draft reports. The JPO will also assist in the selection and entry of data into databases and will use specialized information analysis software tools to construct analytical models. The results will be used in SGIM ICA analytical products that will be provided to the operations divisions and the DDG's office.
3.3 Consequences if task is not performed:
SGIM ICA will not be able to meet the increasing demand for open source information analysis in support of the state evaluation process and ongoing Safeguards investigations. As a consequence, some analytical issues may not be addressed in a timely manner resulting in a reduced confidence in the safeguards conclusions.
4. IAEA Proposed Work Outline:
4.1 Major task stages with timing:
A
one-year JPO is envisioned, to begin in Summer 2008.
4.2 Support Division(s) / Section(s): SGIM / ICA
4.3 End User Division(s) / Section(s): SGIM / ICA
4.4 Estimated duration in months: 12
5. Safeguards Approval Process - not displayed
6. Acceptance by MSSP(s)
6.1 MSSP(s) to which task is proposed: Date accepted: Agency Task ID:
USA
SPRlCS- Support Programme Information and Communication System