SUPERCONDUCTING MAGNET
DIVISION
2008 Tier 1 Inspection Schedule
|
Frequency |
Building |
1st Quarter |
2nd Quarter |
3rd Quarter |
4th Quarter |
|
A |
902B (Offices) |
1/9/08 |
|
|
|
|
A |
902C (Modular Offices) |
1/9/08 |
|
|
|
|
A |
903-Upper Level (Offices) |
1/9/08 |
|
|
|
|
A |
902A (Offices) |
1/9/08 |
|
|
|
|
S |
902-High Bay |
1/30/08 |
|
7/30/08 |
|
|
S |
902-East End Shops |
|
4/9/08 |
|
10/8/08 |
|
A |
902-Walkway |
|
4/9/08 |
|
|
|
S |
902-Trenches |
|
4/9/08 |
|
10/8/08 |
|
S |
902-West End Shops |
2/27/08 |
|
8/27/08 |
|
|
S |
902-Pump Room |
2/27/08 |
|
8/27/08 |
|
|
S |
904 |
|
5/14/08 |
|
11/12/08 |
|
S |
943 |
|
5/14/08 |
|
11/12/08 |
|
S |
944 |
|
5/14/08 |
|
11/12/08 |
|
S |
948 |
|
5/14/08 |
|
11/12/08 |
|
S |
902-D-B Compressor |
|
5/14/08 |
|
11/12/08 |
|
S |
902-SSTF |
|
5/14/08 |
|
11/12/08 |
|
S |
905 |
3/26/08 |
|
9/24/08 |
|
|
S |
902-Annex |
3/26/08 |
|
9/24/08 |
|
|
A |
899 |
3/26/08 |
|
|
|
|
S |
903-Lower Level |
3/26/08 |
|
9/24/08 |
|
|
A |
924 |
|
5/28/08 |
|
|
|
A |
Building
Exteriors |
|
6/11/08 |
|
|
Revised 11/20/07
By: K. Krasner