go to BNL home page

Production & Testing

Environmental, Safety & Health

QA & Manufacturing Documentation

Training

Technical Information

Publications

Meetings & Workshops

Staff pages

Computer help

Projects

  HTS Magnet Program

  High Field Magnet R&D

  Linear Collider Final Focus

  e Lens Solenoid

  Correctors for J-PARC

  LARP

  APUL

  Past Projects

  

e Lens Solenoid

R. Gupta, 3/30/10
    
Initial Design of 200 mm, 6T Superconducting Solenoid for e-lens

R. Gupta, 4/6/10
    
Iterated Design of 200 mm, 6T Superconducting Solenoid for e-lens

R. Gupta, 4/14/10
    
Corrector Designs for Superconducting Solenoid for e-lens

P. Kovach, 5/25/10
    
eLens Layout

A. Marone, 5/25/10
    
eLens Main Solenoid

R. Gupta, 6/15/10
    Optimization in Corrector Design for Superconducting Solenoid for e-Lens

A. Marone 8/24/10
     Main Solenoid Axial Force retention

R. Gupta 9/28/10
     Superconducting Solenoid for e-lens with Fringe Field Coil

M. Anerella, 1/4/11
    
eLens Schedule
     Status

M. Anerella, 1/18/11
     Status

M. Anerella, 2/1/11
     Status

M. Anerella, 2/15/11
     Status

M. Anerella, 3/29/11
     Status

M. Anerella, 4/12/11
     Status

M. Anerella, 5/10/11
     Status

M. Anerella, 6/7/11
     Status

M. Anerella, 6/21/11
     Status

M. Anerella, 8/30/11
     Status

M. Anerella, 10/11/11
     Status

M. Anerella, 02/14/12
     Status

M. Anerella, 04/10/12
     Status

M. Anerella, 05/22/12
     Status

 

Internal Project Documents (password required)

Last update on: May 23, 2012 by R. Felter.