SUPERCONDUCTING MAGNET DIVISION
2005 Tier 1 Inspection Schedule
|
Frequency |
Building |
1st Quarter |
2nd Quarter |
3rd Quarter |
4th Quarter |
|
A |
902B |
1/4/05 |
|
|
|
|
A |
902C (Modular Offices) |
1/4/05 |
|
|
|
|
A |
903-Upper Level |
1/4/05 |
|
|
|
|
A |
902A |
1/4/05 |
|
|
|
|
Q |
902-High Bay |
1/18/05 |
4/19/05 |
7/12/05 |
10/4/05 |
|
Q |
902-East End Shops |
2/1/05 |
5/3/05 |
7/26/05 |
10/18/05 |
|
A |
902-Walkway |
2/1/05 |
|
|
|
|
S/A |
902-Trenches |
2/1/05 |
|
7/26/05 |
|
|
Q |
902-West End Shops |
2/15/05 |
5/17/05 |
8/2/05 |
11/1/05 |
|
Q |
902-Pump Room |
2/15/05 |
5/17/05 |
8/2/05 |
11/1/05 |
|
A |
902-Trailers |
2/15/05 |
|
|
|
|
S/A |
904 |
3/1/05 |
|
8/16/05 |
|
|
Q |
943 |
3/1/05 |
6/7/05 |
8/16/05 |
11/15/05 |
|
Q |
944 |
3/1/05 |
6/7/05 |
8/16/05 |
11/15/05 |
|
Q |
948 |
3/1/05 |
6/7/05 |
8/16/05 |
11/15/05 |
|
Q |
902-D-B Compressor |
3/1/05 |
6/7/05 |
8/16/05 |
11/15/05 |
|
Q |
902-SSTF |
3/1/05 |
6/7/05 |
8/16/05 |
11/15/05 |
|
Q |
905 |
3/15/05 |
6/21/05 |
9/6/05 |
12/6/05 |
|
Q |
902-Annex |
3/15/05 |
6/21/05 |
9/6/05 |
12/6/05 |
|
A |
899 |
3/15/05 |
|
|
|
|
S/A |
903-Lower Level |
3/15/05 |
|
9/6/05 |
|
|
S/A |
924 |
4/5/05 |
|
9/20/05 |
|
Revised 12/29/04
By: J. Durnan