SUPERCONDUCTING MAGNET DIVISION
2007 Tier 1 Inspection Schedule

Frequency

Building

1st Quarter

2nd Quarter

3rd Quarter

4th Quarter

A

902B

1/17/07

 

 

 

A

902C (Modular Offices)

1/17/07

 

 

 

A

903-Upper Level

1/17/07

 

 

 

A

902A

1/17/07

 

 

 

Q

902-High Bay

2/7/07

5/2/07

7/11/07

10/3/07

Q

902-East End Shops

2/21/07

5/16/07

7/25/07

10/17/07

A

902-Walkway

2/21/07

 

 

 

S/A

902-Trenches

2/21/07

 

7/25/07

 

Q

902-West End Shops

3/7/07

5/30/07

8/8/07

11/7/07

Q

902-Pump Room

3/7/07

5/30/07

8/8/07

11/7/07

A

902-Trailers

3/7/07

 

 

 

S/A

904

3/21/07

 

8/22/07

 

Q

943

3/21/07

6/6/07

8/22/07

11/21/07

Q

944

3/21/07

6/6/07

8/22/07

11/21/07

Q

948

3/21/07

6/6/07

8/22/07

11/21/07

Q

902-D-B Compressor

3/21/07

6/6/07

8/22/07

11/21/07

Q

902-SSTF

3/21/07

6/6/07

8/22/07

11/21/07

Q

905

4/4/07

6/20/07

9/5/07

12/5/07

Q

902-Annex

4/4/07

6/20/07

9/5/07

12/5/07

A

899

4/4/07

 

 

 

S/A

903-Lower Level

4/4/07

 

9/5/07

 

S/A

924

4/18/07

 

9/19/07

 

 

Revised 1/9/2007

By: A. Piper

 

Privacy and Security Notice