Status and Plans with Cable (BSCCO 2212) Common Coil Program
- One 10-turn HTS coil has been wound and being prepared for test.
- Other should be wound and ready in ~one month.
- Test these two coils separately and together in the common coil configuration.
- Also test in the background field of Nb3Sn coils.
- Test 20 turn coil with Mixed strand cable.
Then depending on the progress, continue with more 10-turn coils and/or go for full 50-turn program. (either with mixed strand cable BSCCO or with all HTS cable).