A Combined Function Magnet Option(Estimated cost savings for VLHC)
SSC Main Quads: ~$200 million; VLHC: ~$400 million (x2 not 2.5)
Additional savings also from tunnel, interconnect, contingency, etc.
Estimated savings by eliminating main quads: ~$500 million (1990)
SSC: 20+20 TeV; VLHC: 50+50 TeV
Another Major Sub-system: HEB
2 TeV HEB Cost in SSC (derived):
Estimated for 5 TeV (5-50 TeV vlhc):
A possibility to save 70-80% of it follows.
(Table used to get rough estimates)
Cost savings in equivalent 20xx $?
Retaining benefits of Synchrotron Damping
(Derived based on certain assumptions)