Magnet Construction Plan for Neutrino Factory Storage Ring Dipole Model at BNL
We have got a limited funding under LDRD. With that we are building a series of short coils (length same as in study 2).
The cross section in the magnet under construction belongs to an earlier design; but all design principles remain the same.
The magnet will be made using ITER cable and therefore would reach a lower (~4 T) field.