Overview of Project

Brookhaven Info

Contacting Collaboration

Schedules

Pictures

Publications

Presentations

Computing

Phobos Twiki

New: HI Collision Animations

Mirror sites

Copyright 2006 by the Phobos Collaboration. All rights reserved.
Contact webmaster with
questions or comments.
 

Phobos Publications by Title

"The 10 Step Way to Navigate the RHIC Bureaucracy". Steadman, S. Phobos 96-10.04. Presentation at UIC Collaboration Meeting, 3 pp.,
9/21/96.

"Agenda: 10/22/92". Author unknown; pages missing. Phobos 92-25. Presentation at MIT Collaboration Meeting, 3 pp., 10/22/92.

"Agenda for Rochester Collaboration Meeting". Wyslouch, B. Phobos 97-01.16. Presentation at Rochester Collaboration Meeting, 2 pp.,
1/17/97.

"Algorithm Tests for Momentum Fitting in PHOBOS". McLeod, D. Phobos 92-17. Report, 10 pp., 10/23/92.

"Analysis of the Possibility of the Particle Identification by the TOF Detector in PHOBOS Experiment". Wozniak, K. Phobos 94-41.
11/24/94.

"Analysis of the Width of the Track Roads". Wozniak, K. Phobos 94-46. Report, 10 pp., 12/1/94.

"Analysis of the Width of Track Road - part II". Wozniak, K. Phobos 94-40. Report, 11/4/94.

"Analytical Estimation of the Width of the Track Road ". Wozniak, K. Phobos 95-03. 1/30/95.

"Background and Occupancy in the Phobos Spectrometers". Wozniak, K. Phobos 96-17. Report, 12/17/96.

"Beam Pipe '95". Remsberg, L. Phobos 95-05.07. Presentation at MIT, 3/4/95.

"Beam Pipe Issues & Plans". Remsberg, L. Phobos 95-12.10. Presentation at Yale Collaboration Meeting, 1-6 pp., 9/29/95.

"Beam Test Resolution Si and GaAs Microstrip Detectors With Length up to 64 cm". Braunschweig, W., Syben, O., Toporowski, M.,
Tenbusch, F., Wittmer, B., Adriani, O., Balboni, C., Castellini, G., Anticic, T., Chien, C., Pevsner, A., Spangler, W., Chang, Y., Chen, A.E., Hou,
S.R., Huang, K.T., Lin, W.T., Alpat, B., Battiston, R., Fiandrini, E., Gingu, C., Ionica, M., Laricia, P., Toker, O., Laurikainen, P., Orava, R.,
Ostonen, R., Spartiotis, K. Phobos 95-20. Report, 33 pp.

"BNL CDR Go-ahead Letter". Schwartz, M. Phobos 92-15. Official stuff, 1 p., 9/30/92.

"BNL TAC PHOBOS Simulation and Construction Update Letter". Ludlam, T. Phobos 94-39. Official stuff, 2 pp., 11/14/94.

"Box Structure Prototype: Manufacturing and Tests". Despet, M., & Stodulski, M. Phobos 96-12.02. Presentation at MIT Monthly
Meeting, 12 pp., 10/11/96.

"CDF Experience with Central Silicon Microvertex Detectors". Tkaczyk, S. Phobos 95-16. Reference, 62 pp.

"Change in RHIC rf Memorandum". Ozaki, S., Harrison, M., & Ludlam, T. Phobos 95-13. Official stuff, 1 p., 10/9/95.

"Clustering and Spatial Resolution of Silicon Microstrip Detector". Hou, S., Chen, A., Chou, K.C., Lin, W.T., & Chang, Y.H. Phobos
95-18. Report, 24 pp.

"Code Management". Stephans, G.S.F. Phobos 92-19. Memo, 3 pp., 10/24/92.

"Code Management Progress (Last 3 Months)". Halliwell, C. Phobos 97-01.14. Presentation at Rochester Collaboration Meeting, 3 pp.,
1/18/97.

"Collaboration Meeting Agenda 3/8-9/96". Busza, W. Phobos 96-02.01. Presentation at BNL Collaboration Meeting, 2 pp., 3/8/96.

"Collaboration Meeting Agenda, June 24-25, 1996". Busza, W. Phobos 96-09.01. Presentation at MIT, 1 p., 6/24/96.

"Collaboration Welcome 3/8/96". Busza, W. Phobos 96-02.02. Presentation at BNL Collaboration Meeting, 2 pp., 3/8/96.

"Comments on HBT and the PHOBOS Standard Detector". Cianciolo, V. Phobos 94-43. Report, 21 pp., 11/21/94.

"Computer Simulation of the Detector in PHOBOS Experiment --Acceptance and Background Calculations". Wozniak, K. Phobos
94-42. Report, 11/24/94.

"Conceptual Design Report". Busza, W., et al. Phobos 94-01. Report, 4/1/94.

"Construction of the Phobos Time-of-flight Wall". Wolfs, F. L. H. Phobos 95-15; U. of Rochester (NSRL-417). Official stuff, 15 pp.,
11/1/95.

"Contribution of A.B. + W.C. + K.Z. to the Narrative for PHOBOS". Bialas, A., Czyz, W., Zalewski, K. Phobos 00.2. Report, 4 pp.

"Cooling and Rigidity Issues in Design of the PHOBOS Mechanical Structures". Stodulski, M. Phobos 93-13. Report, 15 pp., 6/1/93.

"Counting Charged Particles and Photons: A Study of the PHOBOS Multiplicity Array". Patel, M. V. Phobos 94-36. MIT Thesis/UROP,
86 pp., 5/10/94.

"Current Status of Phobos @ RHIC". Betts, R. Phobos 96-08. Argonne National Lab. PHY-8405-HI-96. Report, 11 pp., 4/1/96.

"Current Status of Phobos @ RHIC presentation". Betts, R. Phobos 96-03. Presentation at Snowbird Conference, 6 pp., 2/1/96.

"Current Status of Phobos @ RHIC Publication". Betts, R. Phobos 96-11. Publication in Advances in Nuclear Dynamics 2, Bauer and
Westfall eds., Plenum Press, NY, pp. 225-232, 10/11/96.

"Data Acquisition System". Manly, S. Phobos 97-01.22. Presentation at Rochester Collaboration Meeting, 14 pp., 1/17/97.

"Detector Geometry and Magnetic Field in Off-line Simulations". Trzupek, A. Phobos 96-09.07. Presentation at MIT Collaboration
Meeting, 7 pp., 6/24/96.

"Detector Simulation Studies". Verdier, R. Phobos 94-10. Presentation at BNL Tech Review, 11 pp., 4/4/94.

"Detector Testing Scheduling". van Nieuwenhuizen, G. Phobos 96-02.10. Presentation at BNL Collaboration Meeting, 7 pp., 3/9/96.

"Detector Model and Blueprints". Stodulski, M. Phobos 92-05. Official stuff, 12/31/94.

"The Effective Edge Approximation in PHOBOS". Baker, M., Stephans, G., Cianciolo, V. Phobos 94-22. Memo, 5 pp., 8/15/94.

"Electronics". Wadsworth, B. Phobos 93.07. Presentation at Collaboration meeting, 10/1/93.

"Electronics for the PHOBOS detector". Wadsworth, B. Phobos 92-21. Presentation at BNL Collaboration meeting, 16 pp., 4/10/92.

"Endgame Plans and Issues". Stephans, G. Phobos 95-05.13. Presentation at MIT, 7 pp., 3/4/95.

"Events at PHOBOS from Beam Gas Interactions". Hill, J.C. Phobos 00.1. Presentation, 5 pp.

"Facilities". Stephans, G. Phobos 96-10.17. Presentation at UIC Collaboration Meeting, 10 pp., 9/20/96.

"Facilities 1/97". Stephans, G. Phobos 97-01.11. Presentation at Rochester Collaboration Meeting, 5 pp., 1/18/97.

"Fiber-Optic Link for Digital Application". Kulinich, P. Phobos 95-05.01. Presentation at MIT Collaboration Meeting, 9 pp., 3/4/95.

"Fiscal Issues". Steadman, S. Phobos 97-01.15. Presentation at Rochester Collaboration Meeting, 5 pp., 1/18/97.

"Frankfurt Manpower". Roland, G. Phobos 96-10.06. Presentation at UIC Collaboration Meeting, 16 pp., 9/20/96.

"Front-End Electronics". Wadsworth, B., Plesko, M., Britton, C. Phobos 96-02.24. Presentation at BNL Collaboration Meeting, 18 pp.,
3/8/96.

"Front-End Electronics 6/96". Plesko, M., Fitch, J., Kulinich, P., Stephans, G., Gomes, C., Neal, M., Ross, D., Wadsworth, B. Phobos
96-09.12. Presentation at MIT Collaboration Meeting, 20 pp., 6/24/96.

"Front-End Electronics 9/96". Plesko, M., Fitch, J., Kulinich, P., Steadman, S., Gomes, C., Neal, M., Ross, D., Wadsworth, B., Britton, C.,
Clonts, L., Jagadish, U., Boisvert, D., Holloway, P., Margolycz, J., presented by B. Wadsworth. Phobos 96-10.03. Presentation at UIC
Collaboration Meeting, 46 pp., 9/21/96.

"Front-End Electronics 1/97". Plesko, M., Fitch, J., Kulinich, P., & Steadman, S. Phobos 97-01.02. Presentation at Rochester Collaboration
Meeting, 14 pp., 1/18/97.

"Front-end Electronics: Overview, Status & Issues". Wadsworth, B. Phobos 94-51. Presentation at MIT Collaboration meeting, 8/29/94.

"Front-end Electronics: Packaging, Assembly & Testing 1/97". Plesko, M., Fitch, J., Kulinich, P., & Steadman, S. Phobos 97-01.05.
Presentation at Rochester Collaboration Meeting, 27 pp., 1/18/97.

"Front-End Electroncis: Pipeline Chip 1/97". Plesko, M., Fitch, J., Kulinich, P., & Steadman, S. Phobos 97-01.04. Presentation at Rochester
Collaboration Meeting, 27 pp., 1/18/97.

"Funding Letter". Ludlam, T. Phobos 94-56. Official stuff, 2 pp., 11/28/96.

"Funding Update Letter". Ludlam, T., & Ozaki, S. Phobos 95-23. Official stuff, 2 pp., 6/30/96.

"Geometry Description of PHOBOS Detector in PMC Simulations". Trzupek, A. (no copy available) Phobos 95-07.

"Geometry Description of the PHOBOS Detector for PMC Simulations: Version 3.0". Trzupek, A. Phobos 96-07. 4/2/96.

"Ghosts". Wozniak, K. Phobos 94-32. Presentation at MIT Collaboration Meeting, 17 pp., 8/29/94.

"High ETA Trigger Counters". Mignerey, A. Phobos 97-01.19. Presentation at Rochester Collaboration Meeting, 6 pp., 1/18/97.

"Issues Common to All 4 Experiments". White, S. Phobos 96-02.15. Presentation BNL at Collaboration Meeting, 10 pp., 3/9/96.

"Implications of Pattern Recognition Studies on Detector Redesign". Baker, M., Halliwell, C. Phobos 94-30. Presentation at MIT
Collaboration Meeting, 12 pp., 8/29/94.

"Improved Process of Fabrication AC-coupled Silicon Micro-strip Sensors". Tsay, W., Hong, J., Chen, A., Lin, W.T., Hsu, C., Jan, S.,
Kuo, C. Phobos 94-54; Nucl. Inst. and Meth. A 351 (1994). Publication, pp. 463-465, 5/6/94.

"The Influence of B Field and Physics Processes on the Particle Tracks in PHOBOS Spectrometer". Baker, M., Trzupek, A. Phobos
95-01. Report, 29 pp., 3/1/9.

"Krakow Offline Software: Status and Plans". Wosiek, B. Phobos 97-01.13. Presentation at Rochester Collaboration Meeting, 18 pp.,
1/18/97.

"Krakow Software Group: Ongoing Projects & Future Plans". Wosiek, B. Phobos 96-02.19. Presentation at BNL Collaboration Meeting, 2
pp., 3/9/96.

"Letter of Intent Approval Letter". Schwartz, M. Phobos 92-14. Official stuff, 1 p., 9/30/92.

"A Letter of Intent to Study Very Low Pt Phenomena at RHIC". Busza, W. et al. Phobos 92-01. Report, 34 pp., 2/1/94.

"A Letter of Intent to Study Very Low Pt Phenomena at RHIC Slides". Busza, W. et al. Phobos 93-12. Presentation at BNL,16 pp.,
2/28/93.

"Low Pt Physics and Compact Detectors at RHIC and LHC". Busza, W. in Particle Production in Highly Excited Matter, Plenum Press
Publication, pp. 149 - 157. Phobos 93-21. 1/1/93.

"MIT Collaboration Meeting Agenda". Busza, W. Phobos 95-05.03. Reference, 2 pp., 3/1/95.

"MIT Software Status and Plans". Verdier, R. Phobos 96-02.04. Presentation at BNL Collaboration Meeting, 25 pp., 3/7/96.

"Magnet". Rosenberg, L. Phobos93-08. Presentation at Collaboration meeting, 10/1/93.

"Magnet Issues". Rosenberg, L. Phobos 94-27. Presentation at MIT Collaboration Meeting, 10 pp., 8/29/94.

"Magnetic Field". Decowski, P., & Rosenberg, L. Phobos 96-10.07. Presentation at UIC Collaboration Meeting, 9 pp., 9/20/96.

"Management Plan Cover Letter". Busza, W. Phobos 96-06. Official stuff, 2 pp., 3/20/96.

"Measurements of the Phi Particle Properties". Olszewski, A. Phobos 96-10.13. Presentation at UIC Collaboration Meeting, 11 pp.,
9/20/96.

"Mechanical Structure and Cooling". Stodulski, M. Phobos 93.03. Presentation at Collaboration meeting, 10/1/93.

"Mechanical Structure and Cooling System for Phobos Experiment". Galuszka, K., Godlewski, J., Kotula, J., Lemler, M., Michalowski, J.,
Stodulski, M., & Szalapak, L. Phobos 96-12.01. Presentation at MIT Monthly Meeting, 12 pp., 10/11/96.

"Mechanical Structure and Cooling System of the Phobos Silicon Detectors". Stodulski, M. Phobos 95-05.10. Presentation at MIT, 10
pp., 3/4/95.

"Mechanical Structures and Cooling System of the Phobos Silicon Detectors 6/96". Bogucki, W., Galuszka, K., Godlewski, J., Kotula, J.,
Lemler, M., Michalowski, J., Stodulski, M. Phobos 96-09.04. Presentation at MIT Collaboration Meeting, 16 pp., 6/24/96.

"Mechanical Structures and Cooling System for the Phobos Silicon Detectors".> Bogucki, W., Galuszka, K., Godlewski, J., &
Kotula, J. Phobos 97-01.29. Presentation at Rochester Collaboration Meeting, 20 pp., 1/17/97.

"Mechanical Structures and Cooling System of the Phobos Silicon Detectors". Godlewski, J., Kotula, J., Lemler, M., Stodulski, M.,
Szalapak, L. Phobos 95-11. 12/21/95.

"Mechanical Structures and Cooling Systems of the Phobos Silicon Detectors". Godlewski, J., Kotula, J., Lemler, M., Stodulski, M.,
Szalapak, L. Phobos 95-12.07. Presentation at Yale Collaboration Meeting, 16 pp., 9/29/95.

"The Momentum Resolution in Phobos Spectrometer". Wozniak, K. Phobos 6-09.09. Presentation at MIT Collaboration Meeting, 16
pp., 6/24/96.

"Momentum Resolution in Phobos Spectrometer"." Wozniak, K. Phobos 96-16. Report, 11 pp., 12/17/96.

"Monte Carlo Status". Verdier, R. Phobos 94-07. Presentation at Software meeting, 4/19/94.

"Multiplicity and Vertex Detector". Betts, R. Phobos 95-05.06. Presentation at MIT, 5 pp., 3/4/95.

"Multiplicity and Vertex Detector 1/97". Betts, R. Phobos 97-01.06. Presentation at Rochester Collaboration Meeting, 2 pp., 1/18/97.

"Multiplicity & Vertex Detectors Beam Pipe Design". Remsberg, L. Phobos 94-28. Presentation at MIT Collaboration Meeting, 1 p.,
8/29/94.

"New Cleanroom Workstation". van Nieuwenhuizen, G. Phobos 96-10.13. Presentation at UIC Collaboration Meeting, 13 pp.,
9/20/96.

"The New Vertex Detector Design". Ganz, R. Phobos 97-01.07. Presentation at Rochester Collaboration Meeting, 13 pp., 1/18/97.

"Non-stopping Particle Identification in the PHOBOS Detector". Trzupek, A., Katz, A., Steadman, S., Stephans, G.S.F. Phobos 95-02.
Report, 20 pp., 3/1/95.

"Notes on the Front-end Electronics for the PHOBOS Experiment at RHIC". Plesko, M., Wadsworth, B. Phobos 92-20. Memo, 11
pp., 9/14/92.

"Notes on the Status of Preparations for Writing a Letter of Intent to Study low Pt physics at RHIC". Busza, W. Phobos 91-02.
Report, 13 pp., 10/18/91.

"Occupancy in the Spectrometer". Wozniak, K. Phobos 94-37. Presentationa t MIT Collaboration Meeting, 18 pp., 8/29/94.

"Off. Software Session". Baker, M. Phobos 95-05.15. Presentation at MIT Collaboration Meeting, 2 pp., 3/5/95.

"Offline Computing". Halliwell, C. Phobos 95-12.12. Transparencies for use, Yale Collaboration Meeting, 2 pp., 9/30/95.

"Online Event Selection for PHOBOS". Roland, G. Phobos93-14. Memo, 7 pp., 11/18/93.

"Outline". Tsay, V. Phobos 97-01.26. Presentation at Rochester Collaboration Meeting, 24 pp., 1/17/97.

"Paddle Triggers". Mignerey, A. Phobos 95-12.09. Presentationat Yale Collaboration Meeting, 2 pp., 9/29/95.

"Partial Results of the New Analysis That I Have Performed with the Help of the FSIM Program". Olszewski, A.Phobos95-10.

"Particle Identification Plans". Trzupek, A. Phobos94-35. Presentationat MIT Collaboration meeting, 5 pp., 9/29/94.

"Pattern Recognition in the PHOBOS Apparatus". Conner, C., Halliwell, C. Phobos94-26. Report, 35 pp., 5/12/94.

"Pattern Recognition in the PHOBOS Apparatus '91". Conner, C., Halliwell, C. Phobos91-04. Report, 36 pp., 12/5/91.

"Performance of Silicon Strip Detector in Electromagnetic Shower". Hou, S.R., Chang, Y.H., Chen, A., Lin, W.T. Phobos94-53.
Reference, 18 pp., 7/10/94.

"Phobos". Busza, W. Phobos91-03. Report, 9 pp.

"The Phobos 1 Sensor Testing Results". Chang, Y. H. Phobos 96-02.22. 26 pp., 3/9/96.

"Phobos.2/Preamplifier Test". Plesko, M. Phobos 96-02.23. Presentation at BNL Collaboration Meeting, 26 pp., 3/9/96.

"Phobos 4 pi Charged Particle Detector". Busza, W. Phobos 94-24. Presentation at Kovar visit to HIG, 1 p., 9/7/94.

"Phobos@AGS: A Study of High Baryon Density Matter Using the Phobos Spectrometer". Stephans, G.S.F., Manly, S., et al. Phobos
93-01. Report, 41 pp., 8/19/93.

"Phobos and the Phi Meson". Cianciolo, V. Phobos 94-44. Memo, 15 pp., 11/21/94.

"Phobos Beam Pipe Requirements". Remsberg, L. Phobos 96-02.13. Presentation at BNL Collaboration Meeting, 5 pp., 3/9/96.

"Phobos Beam Pipe Update: Beginning of the Saga". Remsberg, L. Phobos 97-01.09. Presentation at Rochester Collaboration
Meeting, 6 pp., 1/18/97.

"Phobos Collaboration Meeting Software Summary". Verdier, R. Phobos 97-01.12. Presentation at Rochester Collaboration
Meeting, 35 pp., 1/18/97.

"Phobos Construction Status". Wyslouch, B. Phobos 96-02.14. Presentation at BNL Collaboration Meeting, 20 pp., 3/8/96.

"Phobos Construction Status 6/96". Wyslouch, B. Phobos 96-09.02. Presentation at MIT Collaboration Meeting, 15 pp., 6/24/96.

"Phobos Construction Status 1/97". Wyslouch, B. Phobos 97-01.18. Presentation at Rochester Collaboration Meeting, 20 pp., 1/17/97.

"Phobos Construction Organization and Status". Wyslouch, B. Phobos 96-10.10. Presentation at UIC Collaboration Meeting, 17 pp.,
9/20/96.

"Phobos Construction Progress Report: FY1996, Quarter 3". Steadman, S. Phobos 96-14. Report, 6 pp., 12/6/96.

"Phobos Construction Progress Report: FY1996, Quarter 4". Steadman, S. Phobos 96-15. Report, 6 pp., 12/6/96.

"Phobos Cost and Schedule". Wyslouch, B. Phobos 94-18. Presentation at BNL Tech Review, 21 pp., 4/6/94.

"Phobos DAQ". Manly, S. Phobos 94-15. Presentation at BNL Tech Review, 9 pp., 4/6/94.

"Phobos Data Structure (version 2.1)". Halliwell, C., Ryan, J. Phobos 95-21. Report, 1/23/96,

"Phobos Design Review Agenda". Author unknown. Phobos 94-52. Presentation at BNL, 1 p., 4/6/94.

"The Phobos Detector". Ludlam, T. W., Stevens, A. J. in A Brief Description of the Relativistic Heavy Ion Collider Facility.Phobos
93-19. Brookhaven National Laboratory Reference, pp. 29 - 32, 6/1/93.

"Phobos Detector: Apparatus and People". Wyslouch, B. Phobos 94-19. Presentation at BNL Tech Review, 35 pp., 4/6/94.

"Phobos Detector Design and Fabrication: Design of Custom Front-end Electronic Systems for the PHOBOS Detector at the
Brookhaven National Laboratory Relativistic Heavy-ion Collider". Steadman, S., et al. Phobos93-04. Report, 11/1/93.

"Phobos Electronic Status". Stephans, G. Phobos95-05.02. Presentationat MIT Collaboration Meeting, 1 p., 3/4/95.

"Phobos Electronics Status". Stephans, G. Phobos95-12.01. Presentationat Yale Collaboration Meeting, 4 pp.,9/29/95.

"Phobos Experiment at RHIC". Wozniak, K. Phobos 95-09.Stara Lesna XXV International Symposium on the Multiparticle
Dynamics, Publication, 10 pp., 11/30/95.

"The Phobos Experiment at RHIC and AGS". Wyslouch, B. Phobos 94-12. Nuclear Physics A, Publication, pp. 305c - 310c, 1/1/94.

"Phobos Experiment at RHIC Presentation". Wozniak, K. Phobos95-22. Int. Symposium on Multiparticle Dynamics, Stara Lesna,
Slovakia, Sept. '95, Report, 10 pp., 12/1/95.

"The Phobos Experiment at RHIC: Review of Detector Front-end Electronics". Konstantinidis, T., Plesko, M., Wadsworth, B.
Phobos 93-17. Presentation at MIT electronics review, 82 pp., 4/22/93.

"Phobos Facilities Status". Stephans, G. Phobos 95-12.03. Presentation at Yale Collaboration Meeting, 4 pp.,9/29/95.

"Phobos Fast SIMulation". Verdier, R., Ryan, J., Baker, M., Stephans, G.S.F., Presented by V. Cianciolo. Phobos94-29.
Presentationat MIT Collaboration Meeting, 16 pp., 8/30/94.

"Phobos Fast SIMulation (FSIM) - Status and Plans". Cianciolo, V., Verdier, R. Phobos 94-45. Reference, 23 pp., 11/21/94.

"Phobos Flow Chart". Ryan, J. Phobos 92-18. Reference, 12 pp., 10/23/92.

"Phobos Front-end Electronics". Konstandinidis, A., Wadsworth, B., et al.Phobos 94-03. Presentation at BNL tech review, 27 pp.,
4/6/94.

"Phobos Front-end Electronics". Wadsworth, B. Phobos 92-22. Presentation at MIT Collaboration Meeting, 5 pp., 6/18/94.

"Phobos Funding Profile". Steadman, S. Phobos 95-05.04. Presentation at MIT, 2 pp., 3/4/95.

"Phobos Hough Transform PR". Roland, G. Phobos 95-05.19. Presentation at MIT Collaboration Meeting, 12 pp., /5/95.

"Phobos Magnet". Rosenberg, L. J Phobos 94-11. Presentation at BNL Tech Review, 11 pp., 4/6/94.

"Phobos Magnet 1/97. Decowski, P. Phobos 97-01.10. Presentation at Rochester Collaboration Meeting, 9 pp., 1/18/97.

"Phobos Magnet - Status Report". Rosenberg, L. Phobos 96-02.20. Presentation at BNL Collaboration Meeting, 11 pp., 3/9/96.

"Phobos Magnetic Fields". Hays, C. N. Phobos 92-12. Thesis/UROP, 10 pp., 8/14/92.

"Phobos Management Plan". Busza, W., Steadman, S. Phobos 96-04. Official stuff, 22 pp., 3/21/96.

"Phobos Mechanical Structure & Cooling System". Godlewski, J., Kotula, J., Lemler, M., Stodulski, M. Phobos 94-02. Presentation
at BNL Tech Review, 12 pp., 4/6/94.

"Phobos Meeting Goals". Phobos 94-25. Transparencies for use, 2 pp., 10/23/94.

"Phobos Minutes". Verdier, R. Phobos 92-10. Report at BNL Collaboration Meeting, 2 pp., 5/15/92.

"Phobos Miscellany". Stephans, G. Phobos 96-02.09. Presentation at BNL Collaboration Meeting, 28 pp., 3/8/96.

"Phobos Multiplicity and Vertex Detector". Betts, R. Phobos 96-02.08. Presentation at BNL Collaboration Meeting, 24 pp., 3/9/96.

"Phobos Multiplicity and Vertex Detector 9/96". Betts, R. Phobos 96-10.18. Presentation at UIC Collaboration Meeting, 16 pp.,
9/20/96.

"Phobos Multiplicity Array Analysis". Patel, M. Phobos 94-21. Thesis/UROP, 23 pp., 8/12/94.

"Phobos Multiplicity Array and Vertex Detector (draft)". Betts, R. Phobos 95-12.04. Report at Yale Collaboration Meeting, 17 pp.,
9/29/95.

"Phobos News, Dec. '94". Rosenberg, L. Phobos 94-48. Memo, 2 pp., 1/16/95.

"Phobos Note UIC 92-1". Halliwell, C. Phobos 92-04. Report, 4 pp., 3/30/92.

"Phobos Note UIC 92-2". Connor, C., Halliwell, C. Phobos 92-06. Report, 9 pp., 4/7/92.

"Phobos Offline Software". Baker, M. Phobos 96-02.26. Presentation at BNL Collaboration Meeting, 6 pp., 3/8/96.

"Phobos Offline Software 6/96". Baker, M. Phobos 96-09.08. Presentation at MIT Collaboration Meeting, 4 pp., 6/25/96.

"Phobos Offline Software Manpower, Organization, and Plans". Baker, M.D. Phobos 95-12.11. Presentation at Yale Collaboration
Meeting, 11 pp., 9/30/95.

"The Phobos PR Status & Future". Roland, G. Phobos 96-02.03. Presentation at BNL Collaboration Meeting, 4 pp., 3/9/96.

"Phobos Pattern Recognition Progress Report". Roland, G. Phobos 95-12.13. Presentation at Yale Collaboration Meeting, 7 pp.,
9/30/95.

"The Phobos Pattern Recognition Software: A Progress Report". Roland, G. Phobos 96-10.02. Presentation at UIC Collaboration
Meeting, 21 pp., 9/21/96.

"Phobos Pattern Recognition Software & Hardware". Halliwell, C. Phobos 92-16. Presentation at MIT Collaboration Meeting, 20 pp.,
10/22/92.

"Phobos Physics Simulation Status Report". Baker, M. Phobos 94-38. Presentation at BNL, 31 pp., 11/9/94.

"Phobos Preamplifier Status at Oak Ridge National Laboratory". Britton, C., Jagadish, U. Phobos 96-02.25. Presentation at BNL
Collaboration Meeting, 15 pp., 3/9/96.

"Phobos Research Proposal Summary". Steadman, S. Phobos 93-20. Official stuff, 14 pp., 11/17/94.

"Phobos Software: Babar C++ Course Transparencies". Phobos 96-13. Reference, 96 pp., 11/21/96.

"Phobos Software Memo".Phobos92-08. Memo, 4 pp., 4/10/92.

"Phobos Spectrometer Detector Design Details; Summary of Design Meeting". Stephans, G. Phobos 96-01.1. Report at MIT Design
Meeting, 20 pp., 2/16/96.

"Phobos Spectroneter Detector Design/Optimization Status". Stephans, G. Phobos 95-12.02. Presentation at Yale at Collaboration
Meeting, 3 pp., 9/29/95.

"Phobos Time of Flight Wall". Wolfs, F. L. H. Phobos 95-12.08. Presentation at Yale Collaboration Meeting, 22 pp., 9/29/95.

"The Phobos Time-of-Flight Wall 9/96". Wolfs, F. Phobos 96-10.20. Presentation at UIC Collaboration Meeting, 20 pp., 9/20/96.

"Phobos Timeline". Steadman, S. Phobos 96-05. Official stuff, 16 pp., 3/21/96.

"Phobos Trigger". Manly, S. Phobos 95-12.06. Presentation at Yale Collaboration Meeting, 18 pp., 9/29/95.

"Phobos Work Breakdown Structure". Busza, W., et al. Phobos 94-08. Report, 4/6/94.

"PID Algorithm (1st order)". Truzpek, A. Phobos 94-34. Presentation, 23 pp., 9/9/94.

"PR Ideas/Studies". Roland, G. Phobos 94-06. Presentation at Software meeting, 4/19/94.

"PR Status". Halliwell, C. Phobos 94-04. Presentation at Software meeting, 4/19/94.

"Preamplifier Chip for the Phobos Front-end Electronics - Functional Specification". Plesko, M., Wadsworth, B. Phobos 93-15.
Reference, 4 pp., 5/19/93.

"Presentation at End of Design Meeting". Stodulski, M. Phobos 96-01.2. Presentation at MIT Design Meeting, 7 pp., 2/16/96.

"Procurement of Apex Si Detectors or 'A Tale of Two Vendors'". Betts, R. Phobos 95-05.12. Presentation at MIT, 5 pp., 3/4/95.

"Progress in Electronics". Plesko, M., Subhani, K., Wadsworth, B. Phobos 93-06. Presentation at Collaboration meeting, 10/1/93.

"Progress Since Last Collaboration Meeting". Remsberg, L. Phobos 96-10.08. Presentation at UIC Collaboration Meeting, 9/21/96.

"Progressive Track Fitting for PHOBOS". McLeod, D. Phobos 92-11. Report, 46 pp., 8/6/92.

"Project Management". Steadman, S. Phobos 96-09.05. Presentation at MIT Collaboration Meeting, 6 pp., 6/24/96.

"Proposal for Implementing CVS". Halliwell, C. Phobos 96-09.06. Presentation at MIT Collaboration Meeting, 14 pp., 6/24/96.

"Proposal to Study Very Low Pt Phenomena at RHIC". Busza, W., et al. Phobos 92-02. Report, 57 pp., 9/1/92.

"Proposed Administrative Changes". Busza, W. Phobos 97-01.17. Presentation at Rochester Collaboration Meeting, 2 pp., 1/17/97.

"Proposed Computer System for the PHOBOS Detector at RHIC". Verdier, R. Phobos 92-03. Report, 4 pp., 2/18/92.

"Prototype Test Results". van Nieuwenhuizen, G. Phobos 96-02.11. Presentation at BNL Collaboration Meeting, 18 pp., 3/9/96.

"Quark Matter '95 Booklet Entry". Busza, W. Phobos 94-47. Publication, 2 pp., 12/1/94.

"RHIC Computing Facility". Baker, M. Phobos 96-10.19. Presentation at UIC Collaboration Meeting, 6 pp., 9/20/96.

"Reason for Hamamatsu Prototype". van Nieuwenhuizen, G. Phobos 96-10.14. Presentation at UIC Collaboration Meeting, 8 pp.,
9/20/96.

"Reliability of GEANT?". Taylor, C. Phobos 97-01.21. Presentation at Rochester Collaboration Meeting, 9 pp., 1/17/97.

"Report of the Technical Advisory Committee Subpanel on the PHOBOS Conceptual Design". Nolan, J., et al. Phobos 94-16. Report,
BNL Tech Review, 1 p., 4/6/94.

"Report on the PHOBOS Front-end Electronics Review". Haller, G., Yarema, R. J. Phobos 94-20. Report, 4 pp., 4/25/94.

Reserved. Phobos 92-09.

"Roadkill Pattern Recognition". Ryan, J. Phobos 95-05.18. Presentation at MIT Collaboration Meeting, 17 pp., 3/5/95.

"Rochester and Phobos". Busza, W. Phobos 95-08. Official stuff, 1 p., 7/24/95.

"Rochester Request to Join PHOBOS Collaboration". Wolfs, F. Phobos 95-06. Official stuff, 2 pp., 6/13/95.

"Root Applications WWW Page". McLeod, D. Phobos 96-10.12. Presentation at UIC Collaboration Meeting, 4 pp., 9/20/96.

"The Root System". Roland, G. Phobos 96-09-10. Presentation at MIT Collaboration Meeting, 34 pp., 6/24/96.

"Selected Silicon Results". Wyslouch, B. Phobos 96-02.07. Presentation at BNL Collaboration Meeting, 11 pp., 3/8/96.

"Signal Rate, Shaping and Pile-up". Kulinich, P. Phobos 96-10.16. Presentation at UIC Collaboration Meeting, 10 pp., 9/20/96.

"Silicon Design". Ryan, J. Phobos 94-05. Presentation at Software meeting, 4/19/94.

"Silicon Detector: Review of PHOBOS Conceptual Design". Ryan, J. J. Phobos 94-17. Presentation at BNL Tech Review, 14 pp.,
4/6/94.

"Silicon Detectors". Ryan, J. Phobos 93-16. Presentation at Collaboration Meeting, 8/1/93.

"Silicon Modules: Thermal and Mechanical Problems". Godlewski, J. Phobos 96-02.12. Presentation at BNL Collaboration Meeting,
12 pp., 8/3/96.

"Silicon Prototyping: WA98 Device". Ryan, J. Phobos 95-05.11. Presentation at MIT, 10 pp., 3/4/95.

"Silicon Sensor R&D in NCU-HEP Group". Chen, A. E., Lin, W. T., Chang, H.Y. Phobos 95-12.05. Presentation at Yale Collaboration
Meeting, 14 pp., 9/29/95.

"Silicon Wafer Testing at UIC". Holzman, B. Phobos 97-01.28. Presentation at Rochester Collaboration Meeting, 6 pp., 1/17/97.

"Slow Controls and Monitoring for the Phobos Experiment at RHIC". Gushue, S. Phobos 97-01.24. Presentation at Rochester
Collaboration Meeting, 3 pp., 1/17/97.

"Software at UIC". Halliwell, C. Phobos 93-10. Presentation at Collaboration meeting, 10/1/93.

"Software Issues".Stephans, G. Phobos 92-23. Memo, 1 p., 10/22/95.

"Software Issues and Conditional Decisions Taken at the Phobos Meeting Apr. 10, 1992 at BNL".Phobos 92-24. Report, 4 pp.,
4/15/92.

"Software Organization". Verdier, R. Phobos 93-11. Presentation at Collaboration meeting, 10/1/93.

"Some Ideas on a Possible 'Small' RHIC Experiment". Busza, W. Phobos 91-01. Memo, 4 pp., 10/9/91.

"Spectrometer Deflection". Stephans, G. Phobos 96-10.21. Presentation at UIC Collaboration Meeting, 3 pp., 9/20/96.

"Status of DAQ 9/96". Manly, S. Phobos 96-10.09. Presentation at UIC Collaboration Meeting, 16 pp., 9/20/96.

"Status of DAQ and Online". Manly, S. Phobos 96-02.17. Presentation at BNL Collaboration Meeting, 24 pp., 3/8/96.

"Status of DAQ and Online Computing". Manly, S. Phobos 95-05.14. Presentation at MIT, 17 pp., 3/4/95.

"Status of Detector Optimization". Baker, M. Phobos 95-05.05. Presentation at MIT, 5 pp., 3/4/95.

"Status of PHOBOS Construction". Wyslouch, B. Phobos 95-05.08. Presentation at MIT, 13 pp., 3/4/95.

"Status of Phobos Management Plan". Steadman, S. Phobos 96-02.21. Presentation at BNL Collaboration Meeting, 6 pp., 3/8/96.

"Status of PHOBOS Multiplicity Analysis". Verdier, R. Phobos 95-05.09. Presentation at MIT, 11 pp., 3/4/95.

"Status of PHOBOS Pattern Recognition". Halliwell, C. Phobos 94-14. Presentation at BNL Tech Review, 10 pp., 4/6/94.

"Status of PHOBOS Pattern Recognition". Halliwell, C. Phobos 94-09. Presentation at MIT, 31 pp., 2/3/94.

"Status of the PMC, September 17, 1996". Verdier, R. Phobos 96-10.01. Presentation at UIC Collaboration Meeting, 15 pp., 9/21/96.

"Status of the Silicon Detector". Lin, W. Phobos 97-01.25. Presentation at Rochester Collaboration Meeting, 9 pp., 1/17/97.

"Status of Silicon Work at MIT". van Nieuwenhuizen, G. Phobos 96-09.03. Presentationat MIT Collaboration Meeting, 10 pp.,
6/24/96.

"Status of Silicon Work at MIT 1/97". van Nieuwenhuizen, G. Phobos 97-01.27. Presentation at Rochester Collaboration Meeting, 7
pp., 1/17/97.

"Status of the PMC under UNIX as of 21-June-1996". Verdier, R. Phobos 96-09.11. Presentation at MIT Collaboration Meeting, 8
pp., 6/25/96.

"Status of Prototype Production in Taiwan". Lin, W. T. Phobos 96-10.05. Presentation at UIC Collaboration Meeting, 5 pp., 9/20/96.

"Status of the Software Design Report". Baker, M. Phobos 94-33. Presentation at MIT Collaboration Meeting 8/29/94.

"Status of the TOF 1/97". Hayes, A., Krishnaswami, G., Johnson, E., & Pak, R. Phobos 97-01.01. Presentation at Rochester
Collaboration Meeting, 9 pp., 1/18/97.

"Status of Trigger Counters". Mignerey, A. Phobos 96-02.05. Presentation at BNL Collaboration Meeting, 1 p., 3/9/96.

"Stopping Particle Identification in the PHOBOS Detector". Trzupek, A. Phobos 95-05.16. Presentation at MIT Collaboration
Meeting, 9 pp., 4/5/95.

"Studies of Large Area Silicon Microstrip Sensors". Tsay, W., Hong, J., Chang, Y.H., Chen, A., Hou, S.R., Hsu, S.L., Lin, C.H., Lin,
W.T., Ting, H., Chiang, S., Chuang, E., & Hwang, S. Phobos 95-17. Publication, 4 pp.

"A Study of the Charge Cluster Characteristics and Spatial Resolution of a Silicon Microstrip Detector". Chang, Y., Chen, A., Hou,
S., Lin, W.T. Phobos 94-55.Reference, 19 pp., 1/1/94.

"Subpanel Report on the PHOBOS Detector Conceptual Design Which was Reviewed at BNL on April 6-7, 1994". Nolen, J. Phobos
94-50. Official stuff, 11 pp., 4/27/94.

"Summary of PHOBOS Collaboration Meeting @ BNL 4/10 - 4/11/92".Phobos 92-07. Report, BNL, 7 pp., 4/10/92.

"System and Circuit Level Analysis of a Biquad Shaping Amplifier for the PHOBOS Particle Detector". Holloway, P. R., Boisvert, D.
M. Phobos 93-18. East Coast Labs, Inc.Report, 29 pp., 1/18/93.

"Technical Report, WBS". Wyslouch, B. Phobos 93.09. Presentation at Collaboration meeting, 10/1/93.

"Temperature Distribution in PHOBOS Detectors ANSYS Simulations". Stodulski, M. Phobos 93.05. Report, 11/1/93.

"Test Beam Results of Shower Development of 50 GeV Electrons Through 1.4 X0 Aluminum". Chang, H., Chen, A., Chou, K.C.,
Hou, S. Phobos 95-19. Report, 29 pp.

"Test of Preamplifier PH3". Kulinich, P. Phobos 97-01.03. Presentation at Rochester Collaboration Meeting, 9 pp., 1/18/97.

"Testbeam '96". Stephans, G. Phobos 96-09.13. Presentation at MIT Collaboration Meeting, 12 pp., 6/24/96.

"Time-of-Flight Progress". Manqing, L. for Held, S., Wolfs, F. Phobos 96-02.06. Presentation at BNL Collaboration Meeting, 12 pp.,
3/9/96.

"Track Road Width and the Ghosts". Wozniak, K. Phobos 95-05.17. Presentation at MIT Collaboration Meeting, 16 pp., 3/5/95.

"Trigger Issues". Taylor, C. Phobos 97-01.20. Presentation at Rochester Collaboration Meeting, 15 pp., 1/17/97.

"UIC Letter of Understanding". Busza, W. Phobos 94-49. Official stuff, 1 p., 11/1/94.

"UIC's Phobos Online Timetable". Halliwell, C. Phobos 96-10.11. Presentation at UIC Collaboration Meeting, 4 pp., 9/20/96.

"University of Illinois at Chicago Software Responsibilities". McLeod, D. Phobos 96-02.18. Presentation at BNL Collaboration
Meeting, 9 pp., 3/9/96.

"Users' Guide to the Monte Carlo for the Phobos Detector at RHIC". Verdier, R. Phobos 92-13. Reference, 5 pp., 8/25/92.

"VRML Displays". Holzman, B. Phobos 97-01.08. Presentation at Rochester Collaboration Meeting, 5 pp., 1/18/97.

"Vertical Uncertainties in the Track Positions in the Phobos Spectrometer". Olszewski, A., Wozniak, K. Phobos 95-04. Report, 9 pp.,
4/1/95.

"Visit by Dennis Kovar - Agenda". Busza, W. Phobos 94-23. Presentation during Kovar visit to HIG, 1 p., 9/7/94.

"Water Cooling of the Silicon Detectors". Godlewski, J., & Stodulski, M. Phobos 93-03. Report, 10/1/93.

"What is a Kalman Progressive Fit, and Why Should We Use It?". McLeod, D. Phobos 94-31.Presentation at MIT Collaboration
Meeting, 3 pp., 8/30/94.

"Workshop on Zero Degree Calorimetry at RHIC". Thomas, J. (chairman) Phobos 95-14. Reference, 10/5/95.