General Information

Top of Page

Beamline U12IR Schedule

Home   Publications   Schedule   Equipment

Unless otherwise specified, beamtime starts at 9am on the initial date and ends at 8am on the final date.

Important -- Cryogenic Users: The NSLS will provide liquid helium for the far infrared detectors only. Unless otherwise indicated, we will assume 1 detector operating each day of beamtime. Users with other cryogenic systems (e.g., ones brought to the NSLS or made available by an on-site research team member) must provide the required liquid helium. You will need your BNL 8XXXX account to place the order on-line from a computer on the BNL network (http://intranet.bnl.gov/ppm/lHeOrderPage.asp). Orders must be placed before 11AM at least two workday prior to delivery, which occur on Mondays, Wednesdays and Fridays, excluding holidays.

September 2012

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
           
0000 Maint. 1
 
 
 
0000 Maint. 2
 
 
 
0000 Holiday 3
 
 
 
0000 Maint. 4
 
 
 
0000 Maint. 5
 
 
 
0000 Maint. 6
 
 
 
0000 Maint. 7
 
 
 
0000 Maint. 8
 
 
 
0000 Maint. 9
 
 
 
0000 Maint. 10
 
 
 
0000 Maint. 11
 
 
 
0000 Maint. 12
 
 
 
0000 Maint. 13
 
 
 
0000 Maint. 14
 
 
 
0000 Maint. 15
 
 
 
0000 Maint. 16
 
 
 
0000 Maint. 17
 
1200 Comm.
 
0000 Comm. 18
 
 
 
0000 Comm. 19
 
1200 Studies
 
0000 Ops. 20
 
 
 
0000 Ops. 21
 
 
 
0000 Ops. 22
 
 
 
0000 Ops. 23

 
 
0000 Ops. 24

 
 
0000 Ops. 25
0800 Studies
 
 
0000 Studies 26

 
 
0000 Ops. 27

 
 
0000 Ops. 28
Sirenko (U4IR-
 ellipsometer)
 
 
0000 Ops. 29
Sirenko (U4IR-
 ellipsometer)
 
 
0000 Ops. 30
Sirenko (U4IR-
 ellipsometer)
 
 
           


October 2012

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
 
0000 Ops. 1
Sirenko (U4IR-
 ellipsometer)
Smith (U12IR)
1800 Timing
0000 Ops. 2
Sirenko (U4IR-
 ellipsometer)
Smith (U12IR)
 
0000 Ops. 3
Sirenko (U4IR-
 ellipsometer)
Smith (U12IR)
 
0000 Ops. 4
Sirenko (U4IR-
 ellipsometer)
Smith (U12IR)
 
0000 Ops. 5
Sirenko (U4IR-
 ellipsometer)
Smith (U12IR)
1800 Studies
0000 Ops. 6
Smith (U12IR)
 
 
0000 Ops. 7
 
 
 
0000 Ops. 8
Smith (U12IR)
Xi & Smith (U10B)
1800 Timing
0000 Ops. 9
Smith (U12IR)
Xi & Smith (U10B)
 
0000 Ops. 10
Smith (U12IR)
Shan (U10B)
 
0000 Ops. 11
Smith (U12IR)
Shan (U10B)
 
0000 Ops. 12
Smith (U12IR)
Shan (U10B)
1800 Studies
0000 Ops. 13
 
Shan (U10B)
 
0000 Ops. 14
 
Shan (U10B)
 
0000 Ops. 15
 
Shan (U10B)
 
0000 Ops. 16
0800 Studies
Xi (U4IR)
 
0000 Studies 17
 
Xi (U4IR)
 
0000 Ops. 18
 
 
 
0000 Ops. 19
 
 
 
0000 Ops. 20
 
 
 
0000 Ops. 21
 
1200 Studies
 
0000 Studies 22
0800 Maint.
 
 
0000 Maint. 23
 
1200 Comm.
 
0000 Ops. 24
Xi (U4IR- magnet)
 
 
0000 Ops. 25
Xi (U4IR- magnet)
 
 
0000 Ops. 26
Xi (U4IR- magnet)
 
1800 Timing
0000 Ops. 27
Xi (U4IR- magnet)
 
 
0000 Ops. 28
Xi (U4IR- magnet)
 
 
0000 Ops. 29
Xi (U4IR- magnet)
 
1800 Timing
0000 Ops. 30
Xi (U4IR- magnet)
 
 
0000 Ops. 31
Xi (U4IR- magnet)
 
 
     


November 2012

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
       
0000 Ops. 1
Sirenko (U4IR- ellipsometer)
 
 
0000 Ops. 2
Sirenko (U4IR- ellipsometer)
 
1800 Studies
0000 Ops. 3
Sirenko (U4IR- ellipsometer)
 
 
0000 Ops. 4
Sirenko (U4IR- ellipsometer)
 
 
0000 Ops. 5
Sirenko (U4IR- ellipsometer)
 
 
0000 Ops. 6
0800 Studies
Xi (U4IR)
 
0000 Studies 7
Xi (U4IR)
 
 
0000 Ops. 8
Sirenko (U4IR- ellipsometer)
Isakovic (U12IR)
 
0000 Ops. 9
Sirenko (U4IR- ellipsometer)
Isakovic (U12IR)
 
0000 Ops. 10
Sirenko (U4IR- ellipsometer)
Isakovic (U12IR)
 
0000 Ops. 11
Isakovic (U12IR)
 
 
0000 Ops. 12
Boris (U4IR- ellipsometer)
Isakovic (U12IR)
1800 Timing
0000 Ops. 13
Boris (U4IR- ellipsometer)
Isakovic (U12IR)
 
0000 Ops. 14
Boris (U4IR- ellipsometer)
Isakovic (U12IR)
 
0000 Ops. 15
Boris (U4IR- ellipsometer)
Isakovic (U12IR)
 
0000 Ops. 16
Boris (U4IR- ellipsometer)
 
1800 Studies
0000 Ops. 17
Boris (U4IR- ellipsometer)
 
 
0000 Ops. 18
Boris (U4IR- ellipsometer)
 
 
0000 Ops. 19
Boris (U4IR- ellipsometer)
 
 
0000 Ops. 20
Boris (U4IR- ellipsometer)
 
 
0000 Ops. 21
0600 Maint.
 
 
0000 Holiday 22
 
 
 
0000 Holiday 23
 
 
 
0000 Maint. 24
 
 
 
0000 Maint. 25
 
 
 
0000 Maint. 26
 
 
 
0000 Maint. 27
 
 
 
0000 Maint. 28
 
 
 
0000 Maint. 29
 
 
 
0000 Maint. 30
 
 
 
 


December 2012

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
           
0000 Maint. 1
 
 
 
0000 Maint. 2
 
 
 
0000 Maint. 3
 
 
 
0000 Maint. 4
 
 
 
0000 Maint. 5
 
 
 
0000 Maint. 6
 
 
 
0000 Maint. 7
 
 
 
0000 Maint. 8
 
 
 
0000 Maint. 9
 
 
 
0000 Maint. 10
 
 
 
0000 Maint. 11
 
 
 
0000 Maint. 12
 
 
 
0000 Maint. 13
 
 
 
0000 Maint. 14
 
 
 
0000 Maint. 15
 
 
 
0000 Maint. 16
 
 
 
0000 Maint. 17
 
 
 
0000 Maint. 18
 
 
 
0000 Maint. 19
 
 
 
0000 Maint. 20
 
 
 
0000 Maint. 21
 
1200 Holiday
 
0000 Maint. 22
 
 
 
0000 Maint. 23
 
 
 
0000 Holiday 24
 
 
 
0000 Holiday 25
 
 
 
0000 Maint. 26
 
 
 
0000 Maint. 27
 
 
 
0000 Maint. 28
 
 
 
0000 Maint. 29
 
 
 
0000 Maint. 30
 
 
 
0000 Maint. 31