Research Program Estimates
CERN Common Costs
These files take the latest CERN Estimates and calculate the U.S. Contribution based upon the sharing percentage and exchange rate. These estimates are incorporated into the M&O Estimates above.
|
|
U.S. ATLAS Category A Costs (Charged to the entire Collaboration) | ||
|
|
U.S. ATLAS Category B Costs (Charged to the Subsystems) |
ATLAS Ready For Installation (RFI) Schedule (Version 6)

This page is maintained by the Steve Kane
Last Updated: January 15, 2004: 11:29 pm EST