Research Program Estimates
Program Summaries
Most Subsystems have incorporated a best estimate for the B&I staffing necessary. The Research Program web page has a better estimate of the FTEs needed for the entire U.S. ATLAS Collaboration for their intended participation in the experiment.
|
FTEs for Entire Research Program (All Subsystems Combined) |
Level 1 |
Level 2 | |||
|
|
U.S. ATLAS Research Program | .doc | .doc | ||
| FTEs for Entire Research Program (Subsystems) | Level 2 | Level 3 | |||
|
|
Silicon Subsystem | .doc | .doc | ||
|
|
Transition Radiation Tracker Subsystem | .doc | .doc | ||
|
|
Liquid Argon Calorimeter Subsystem | .doc | .doc | ||
|
|
Tile Calorimeter Subsystem | .doc | .doc | ||
|
|
Muon Subsystem | .doc | .doc | ||
|
|
Trigger/Data AQuisition Subsystem | .doc | .doc | ||
|
|
Technical Coordination | .doc | .doc | ||

This page is maintained by the Steve Kane
Last Updated:
01/03/2005 01:41 PM -0500