| Section |
Title
|
Page |
|
|
|
| 1 |
INTRODUCTION |
1 |
|
1.1 Purpose and Objectives |
1 |
|
1.2 Other Relevant Data/Information |
2 |
|
1.3 Data Report Format |
2 |
|
|
|
| 2 |
BENCH-SCALE
TREATABMITY STUDY METHODS, PROCEDURES AND ANALYTICAL PROCEDRURES |
3 |
|
2.1 Sediment Sample Preparation |
4 |
|
2.2 Initial Seven (7) Day Cure Chemical Fixation Treatment
Procedures |
6 |
|
2.2.1 Seven (7) Day Cure Mechanical Strength Testing
|
7 |
|
2.2.1.1 Penetrometer Strength Testing
|
7 |
|
2.2.1.2 Volumetric Expansion Testing
|
7 |
|
2.2.2 Seven (7) Day Cure Chemical Performance
Testing
|
8 |
|
2.3 30 Day Cure Chemical Fixation Treatment Procedures |
8 |
|
2.3.1 Glovebox Volatilization Study
|
9 |
|
2.3.2 30 Day Cure Mechanical Strength Testing
|
10 |
|
2.3.3 30 Day Cure Chemical Analysis
|
11 |
|
2.4 Analytical Program |
11 |
|
2.4.1 Base-Line Analysis
|
11 |
|
2.4.2 Initial Seven (7) Day Cure Chemical Compound and Physical
Parameter Analyses
|
12 |
|
2.4.3 30 Day Cure Chemical Compound and Physical Perameter
Sampling
|
12 |
|
|
|
| 3 |
RESULTS
FOR UNTREATED AND 30 DAY CURE ANALYSES |
18 |
|
3.1 Untreated Sediment Sample Results Summary |
19 |
|
3.1.1 Untreated Sediment Total VOC and TCLP VOC Analysis
|
19 |
|
3.1.2 Untreated Sediment Total SVOC and TCLP SVOC Analysis
|
21 |
|
3.1.3 Untreated Sediment Total Pesticides and TCLP Pesticides
Analysis
|
26 |
|
3.1.4 Untreated Sediment Total Herbicides and TCLP Herbicides
Analysis
|
26 |
|
3.1.5 Untreated Sediment Total PCB and TCLP PCB Analysis
|
33 |
|
3.1.6 Untreated Sediment Total Dioxins and TCLP Dioxins Analysis
|
33 |
|
3.1.7 Untreated Sediment Total Furans and TCLP Furans Analysis
|
37 |
|
3.1.8 Untreated Sediment Total TAL Metals and TCLP Metals Analysis
|
38 |
|
3.1.9 Untreated Sediment Physical Properties Analysis
|
43 |
|
3.2 30 Day Cure Sample Results Summary |
45 |
|
3.2.1 Total VOC and TCLP VOC 30 Day Cure Analysis
|
45 |
|
3.2.2 Total SVOC and TCLP SVOC 30 Day Cure Analysis
|
45 |
|
3.2.3 Total Pesticides and TCLP Pesticides 30 Day Cure Analysis
|
46 |
|
3.2.4 Total Herbicides and TCLP Herbicides 30 Day Cure Analysis
|
47 |
|
3.2.5 Total PCB and TCLP PCB 30 Day Cure Analysis
|
47 |
|
3.2.6 Total Dioxins and TCLP Dioxins 30 Day Cure Analysis
|
48 |
|
3..2.7 Total Furans and TCLP Furans 30 Day Cure Analysis
|
49 |
|
3.2.8 Total TAL Metals and TCLP Metals 30 Day Cure Analysis
|
49 |
|
3.2.9 Physical Properties 30 Day Cure Analysis
|
51 |
|
|
|
| 4 |
POTENTIAL
FOR PILOT-SCALE OPERATIONS |
53 |
|
4.1 Process Flow Chart |
54 |
|
4.2 Estimated Mass Balance |
55 |
|
4.3 Treatment Effluents and Disposal Procedures |
56 |
|
4.4 Optimal Water Content |
57 |
|
4.5 Patent Information |
57 |
|
4.6 Estimated Implementation Schedule |
57 |
|
4.7 Demonstration Location |
59 |
|
4.8 Utility Requirements |
59 |
|
4.9 Personnel |
59 |
|
|
|
| 5 |
ADVANTAGES
OF TREATMENT WITH ACT |
60 |
|
|
|
| Appendices |
|
|
|
A
|
Bench-Scale
and Pilot Scale Control Studies |
|
|
B
|
Kiber
Environmental Services, Inc. - Newtown Creek Treatability Study |
|