Counting house with power, climate control, electronics area, computer hookup, furniture, phone hookup, entry for cables, fire protection system
Assembly/staging area for equipment moving into or out of IR
Cable access tunnel and cable tray between the IR and the counting house
Crane (5-10 ton) for installation of the detectors and any reconfiguration of the magnet or detectors.
Clean and dirty power in the IR (~25kW each)
IR monitoring system (TV
hookup to the counting house)
Detector enclosure to ensure proper operating environment
Electronics hut on top of the berm with space for 1-2 racks and 1-2 people with oscilloscopes, power, lights, phone, and climate control
Stairway or other access to electronics hut
Modification of the tunnel fan system, including routing ductwork around the detector elements
Cooling water system for the magnet including controls and hookup
Supports (shielding blocks?) for the detectors
Beam pipe supports
Installation and hookup of power supply, including controls and monitors
Rigging and technicians for detector installation
Design and installation of cable trays and detector supports
Surveying of magnet and
detectors
Climate control and monitoring, phone, general lighting as well as radiation, fire protection and other safety systems in the IR
Accelerator operation monitoring system
Radiation shielding outside access points
Access interlock system on entryways
Access to luminosity monitoring
(ZCAL?)
Lab space for detector assembly (currently assumed to be provided by BNL Chemistry)
Vehicle for transporting
delicate assemblies from lab to RHIC