This page contains descriptions of electronics racks. Please contact George Stephans ASAP if you find any errors or omissions.

NOTE: The following FRONT view is updated to show changes in the right side of the house, the TOP view is slightly older.

There is now a new rack layout based on using several of the nice rack units generously provided by Rochester. The top view shows the spacing of the racks and the locations in relation to the door, windows, straight shot cable tray through the back wall, etc. The plan is for all cables to come up through the floor underneath the racks.

A somewhat kludgy front view shows a proposal for what will be included in each rack. Although we now have more racks, each one is slightly smaller but we still have significant room for expansion.

 

 

OLDER MATERIAL FOLLOWS:

The locations of the racks and electronics bins inside the tunnel are shown as red and light blue rectangles in the drawing. There are currently the following bins and racks:

There are two proposed versions of the rack layout for the counting house, one with larger gaps at the ends and in the middle and another with equal spaces between all the racks. Anyone have a preference? The first one will be used unless someone has a good reason to use something different. These racks will hold (from left to right):