Installation of T0 arrays

November 12, 2002


The T0 arrays were installed in the IR on Tuesday November 12, 2002. The arrays are installed behind ring 2 on the P side and behind ring 3 on the N side. On this page, several pictures of the arrays in the IR are shown.

 

The P side

Location of the T0 array, to be installed behind ring 2 on the P side.

 

The T0 frame and based installed behind ring 2 on the P side.

 

Ray Teng making sure that the PMT cables are properly strain relieved.
The T0 array on the P side, fully installed!

 

The N side

The T0 frame and based installed behind ring 3 on the N side.

The T0 array on the N side, fully installed!

 

The T0 array on the N side, fully installed!
The T0 array on the N side, fully installed!