T0 Counter Upgrade

6/5/02


Click here to start


Table of Contents

T0 Counter Upgrade

Outline

Experience with current T0 counters

T0 Locations As close as possible to Ring 1

Design considerations

T0 Mounts 8 closely-packed T0 Counters: r = 3.25”

T0 Mounts 8 T0 Counters: r = 5.85”

T0 Locations Magnetic Field

T0 Upgrade Estimating Efficiency

T0 Upgrade Proposed locations: T0 counters tilted

T0 Upgrade Proposed locations : T0 counters tilted

T0 Upgrade Centrality dependence

T0 Upgrade Comparing our options

T0 Upgrade Comparing our options

T0 Upgrade Comparing our options

T0 Upgrade Creating an on-line vertex: time-equalizer

The “Skulski” time-equalizer Design specs as of May 2002

Production of time-equalizer boards

T0 Upgrade Milestones

T0 Upgrade Distribution of responsibilities

T0 Upgrade Summary

Author: Frank Wolfs

Email: wolfs@pas.rochester.edu

Home Page: http://teacher.pas.rochester.edu/