Tour of the Phobos Engineering Run Setup

Approaching from entrance hallway.

P0000423p.JPG (50910 bytes)

 

 

Magnet and TOF cabling.

P0000424p.JPG (61463 bytes)

 

 

Magnet, paddle trigger counter, and installed octagon from -Z side.

P0000434p.JPG (50961 bytes)

 

 

Close-up of paddle counter and beampipe "protection".

P0000428p.JPG (55268 bytes)

 

 

Octagon before covering.

P0000393p.JPG (70662 bytes)

 

 

Uncovered octagon inside magnet gap.

P0000395p.JPG (24559 bytes)

 

 

Covered octagon and FEC crate.

P0000435p.JPG (45864 bytes)

 

 

Covered octagon.

P0000429p.JPG (54613 bytes)

 

 

Covered octagon from +Z side.

P0000433p.JPG (59463 bytes)

 

 

TOF frame and electronics (module at right).

P0000425p.JPG (34816 bytes)

 

 

TOF module.

P0000432p.JPG (20249 bytes)

 

 

Trigger electronics and DMU crate (uncovered).

P0000426p.JPG (36982 bytes)

 

 

DMU, MDC, and FFI.

P0000427p.JPG (52322 bytes)

 

 

Lots of delay and HV cables.

P0000431p.JPG (52542 bytes)