Tour of the Phobos Engineering Run Setup
Approaching from entrance hallway.
Magnet and TOF cabling.
Magnet, paddle trigger counter, and installed octagon from -Z side.
Close-up of paddle counter and beampipe "protection".
Octagon before covering.
Uncovered octagon inside magnet gap.
Covered octagon and FEC crate.
Covered octagon.
Covered octagon from +Z side.
TOF frame and electronics (module at right).
TOF module.
Trigger electronics and DMU crate (uncovered).
DMU, MDC, and FFI.
Lots of delay and HV cables.