Wednesday, October 24, 2018, 4:00 pm — Bldg. 911B, Second Floor, Large Conf. Rm., Rm. A2
The design, development and challenges of the fabrication of the DQW crab cavity cryomodule is outlined. The successful installation and beam tests with protons in the SPS machine are presented along lessons learned and future plans for the HL-LHC series manufacturing.