Installation of the final Phobos Configuration

Last Updated Tuesday, May 09, 2000 at 16:12:50

Installation Schedule (ps, gif)

 

Survey schedule (ps,gif)

Schedule breakdown (txt)

Spectrometer Installation Schedule (txt)

Octagon Installation (txt)

Ring Installation (txt)

Survey Breakdown (txt)

Letter to Kirk and Ozaki (htm,doc)