Lewis Doom
NSLS-II Accelerator Division Mechanical Engineering Group Leader, Accelerator Div. Mgmt, National Synchrotron Light Source II

Brookhaven National Laboratory
National Synchrotron Light Source II
Bldg. 744, Room 4L128
P.O. Box 5000
Upton, NY 11973-5000
(631) 344-7583
(631) 599-2101
doom@bnl.gov
Current Position: NSLS-II Accelerator Divsion Mechanical Engineering Group Leader
Expertise
Mechanical Group: Design and manufacture of storage ring girders, magnets and magnet-girder assemblies.
Vacuum Group: Design and manufacture of aluminum vacuum chambers.
Coordination: Interface between operations and all groups relative.
Mechanical Group: Group Leader, responsible for storage ring magnets and girders, front ends, Utilities, Survey, Mechanical design room, Mechanical technical staff.
Education
Bachelor of Science
Univiersity of Vermont

Brookhaven National Laboratory
National Synchrotron Light Source II
Bldg. 744, Room 4L128
P.O. Box 5000
Upton, NY 11973-5000
(631) 344-7583
(631) 599-2101
doom@bnl.gov