General Lab Information

Hybrid Spectrometer (HYSPEC)

Galleries

  • HYSPEC 3D engineering model final update, April 2011


  • HYSPEC 3D engineering model update, June 2010

  • HYSPEC 3D engineering model update, October 2008

  • HYSPEC 3D engineering model update, June 2007

  • HYSPEC 3D engineering model overview, February 2006

Overall_01.jpg (1156766 bytes) overall_02.jpg (1145734 bytes) overall_03.jpg (1089500 bytes) overall_04.jpg (1177578 bytes)

  • Monochromator's drum shield and detector vessel, February 2006

 drum_detector_section-2.jpg (1234408 bytes) drum-1.jpg (1013606 bytes) detector_with_collimators-1.jpg (1120858 bytes)

  • HYSPEC's core vessel insert

SHUTTER_INSERT-6.jpg (875961 bytes) PB110004.JPG (468130 bytes) PB110014.JPG (430345 bytes)

  • Early drafts of 3D engineering pictures of various HYSPEC components, 09/02

hyspec_09-25-02-a.jpg (451033 bytes)  hyspec_09-25-02-b.jpg (333082 bytes) hyspec_09-25-02-c.jpg (539560 bytes) hyspec_09-25-02-d.jpg (350564 bytes)

  • First image of HYSPEC, the "engineers impression"

Hyspec_02-13-02.jpg (136728 bytes)

'

SNS Floor Layout

  • An early iteration of the draft layout of HYSPEC on BL14B and spin-echo on BL14A, May 2003 - 05/21 | 05/06
  • A draft of the HYSPEC floor layout on BL14A - 4.5 m | 4.0 m | IDT sketch
  • An early draft layout on beamline (BL) 15, March 2003 - zoom out | zoom in
'

Conceptual Schematics of the Instrument Setup Proposed by the IDT

  • HYSPEC generic schematics - wmf | cdr | jpg
  • HYSPEC setup schematics - wmf | cdr
  • Schematics of the HYSPEC and straight-through model instrument - wmf | cdr
  • Schematics of the secondary spectrometer - wmf | cdr
  • Setup of the primary spectrometer - wmf | cdr
  • HYSPEC polarized beam commissioning - 2015

  • HYSPEC testing and commissioning - 2012

  • Detector Vessel installation - 2011

  • Monochromator drum and primary beamline (guides, choppers) installation - 2010

  • HYSPEC monochromator drum assembly at the Keller Technology Corporation (item  KTC SO 19207) - July, 2010

  • Primary beamline and shielding installation - June, 2010

  • HYSPEC shutter insert installation - October, 2008

  • Rebar installation for beamline 14, January - February, 2007

100_2052.jpg (722093 bytes)100_2051.jpg (723178 bytes)100_2050.jpg (743948 bytes)100_2049.jpg (747187 bytes) 

  • Core Vessel Insert installation - November, 2006

PB110004.JPG (468130 bytes) PB110014.JPG (430345 bytes)

  • Bulk Shield Insert installed - September, 2006

bsi07.JPG (143353 bytes)bsi06.JPG (151336 bytes)bsi08.JPG (227290 bytes)bsi05.JPG (194984 bytes)bsi04.JPG (195920 bytes)bsi03.JPG (212762 bytes)bsi02.JPG (183943 bytes)bsi01.JPG (194786 bytes)