Have the training and/or experience to exercise group and system-level judgments, and are authorized to lockout and tagout any equipment for which they have division’s approval. If coordinated multiple lock and tags are applied by more than one employee, those of the "responsible employee" must be the first to be applied and the last to be removed.
| SMD - LOTO Authorized Personnel - Responsible | ||
|---|---|---|
| Name | Phone # | Systems/Group |
| Raymond Ceruti | Ext. 7116 | Magnet Production Support |
| John Cintorino | Ext. 2544 | Magnet Test & Measurement |
| Joseph D'Ambra | Ext. 3764 | Superconducting Materials R&D |
| Sebastian Dimaiuta | Ext. 5265 | Electrical Systems Support |
| Glenn Jochen | Ext. 7320 | Magnet Production Support |
| Edward Weigand | Ext. 7160 | Production/Electromechanical Support |
Have the training and/or experience in the safety related technical aspects of the equipment and are authorized to conduct limited lockout and tagging. They cannot install "group or operations locks and/or tags". However, they are authorized to attach additional locks and tags in "operations lock" or “group lock” situations provided that their lock and tag is not the first applied or the last one to be removed.
| SMD - LOTO Authorized Personnel - Knowledgeable | ||
|---|---|---|
| Name | Phone # | Systems/Group |
| Scott Bell | Ext. 5659 | Production/Electromechanical Support |
| Joseph Gormley | Ext. 2386 | Production/Electromechanical Support |
| William McKeon | Ext. 2011 | Cryogenics |
| Dean Ince | Ext. 4677 | Magnet Production Support |
| Richard Meier | Ext. 5498 | Production/Electromechanical Support |
| Daniel Oldham | Ext. 2121 | Electronic Support |
| Andrew Sauerwald | Ext. 7519 | Magnet Test & Measurement |
| Edward Sperry | Ext. 2697 | Superconducting Materials R&D |
| Daniel Sullivan | Ext. 2075 | Production/Instrumentation Support |